Loading…
Loading…
772 results • Recent activity
Construction of road from km 0.000 to km 78.38 of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 55.725 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Rehabilitation and upgradation of Patur-Balapur-Shegaon section of NH-161G from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (Total Length-49.600 km) to 4LPS configuration in the State of Maharashtra on EPC Mode
Strengthening from km 1/2 - 5/2 of Sankarankoil - Vasudevanallur road (M- 1292) (Job.No.TN-CRIF- 2025-26-TNV-53)
Strengthening from km 3/7 - 7/9 of Tiruvattar - Thirparapu road including construction of retaining wall at km 5/8 (M-933)(Job.No.TN-CRIF-2025-26-TNV-56)
Restoration of rain damages of the NH 503 SH Pavement repair works from km 17330 to km 17345 km 18230 to km 18270 km 18730 to km 18780 km 18895 to km 18924 km 20610 to km 20640 km 20690 to km 20720 km 21000 to km 21030 km 21245 to km 21275 km 219