Loading…
Loading…
49 results • Latest
26- Ward No. 21 Reconstruction of the damaged drain in front of the jail and installation of RCC pipes on Court Road and chambers in the culvert near the jail gate.
27- Ward No. 24, Nai Basti Construction and beautification of a large gate named Sant Shiromani Ravidas Dwar on the main road near the Ravidas Temple.
10. Ward No. 17 Installation of signboards marking the lane numbers in every lane on Paniala Road.
28- In Ward No. 24, Salempur Industrial Area, road construction from Atul Saini factory to the Environmental Testing Lab using colored interlocking tiles.
Construction of CC road from house number 341 to 348 in Ward No. 26.
22- Ward No. 20 Construction of the main gate of Sainik Colony with CC or iron pillars near Dr. Pratap house, towards Dr. Bansal side, along the Irrigation Department wall.
14-Construction of a concrete road in the area east of Valmiki Gate in Ward No. 38.
31- In Ward No. 23, Lane No. 27, road and drain construction work using interlocking tiles from Ankur house to Sonu house.
Construction of CC road and drain in Modi Wali Gali in Ward No. 33.
13-Beautification of Vishwakarma Chowk and construction of seating areas in Ward No. 37.
12- Construction of damaged wall with RCC from Tonga Stand to the slope of the embankment in Mohalla Mahigran, Ward No. 35.
20- Ward No. 09 Road and drain channel construction from Arun house to Anil house.
Filling work up to a height of two feet on government land along the drain near Solani Enclave in Ward No. 03, wall construction in some places, and reconstruction of the drain culvert near Tasty Heaven Restaurant using RCC after demolishing the e
3- Construction of interlock tile road and drainage system on Ward No. 19, Shivpuram Main Road, from Sharma Cement Store towards Yogesh house.
4- Construction of road and drainage system in Ward No. 19, Subhash Nagar, from Raghunath Negis house to Dhasmanas house.
Ward No. 23 Krishna Nagar, Lane No. 32 Construction of road and drain with interlocking tiles from Rana Ji house towards Ankit house.
1. Colored interlocking tiles for the vending zone at Kaliyar Adda within the limits of Municipal Corporation Roorkee.
1. Construction of the incomplete portion of the road in front of Praduman Dairy in Ward No. 14, Sector 2.
3. Construction of a road and drain from Gangotri Kunj in Ward No. 19.
1. Construction of an RCC drain from Lane No. 10 on Paniyala Road towards the pond near the railway culvert.
2. Construction of a large RCC drain from in front of the petrol pump in Ward No. 2 towards the river.
11- Construction of CC road and iron channel from Atiqurrahman house to Inamullah house in Ward No. 34.
19- Construction of Jyotiba Phule Gate on the main road in Matlabpur, Ward No. 40.
18- Construction of a road with colored interlocking tiles and drainage systems on both sides from Radhika Chakki to Garibdas house in Indira Vihar Colony, Ward No. 39.
2- Construction of an RCC slab over the drain near Solani Enclave in Ward No. 3, up to Tasty Heaven Restaurant, and construction of chambers every 20 feet.
Construction of large gates at both entrances of the Gihara communitys residence in Ward No. 28.
5- Construction of the main gate at the ancient temple near Chandrapuri Rickshaw Stand in Ward No. 28.
10-Construction of CC road and drain from Master Shakeel house towards Unique Dairy in Ward No. 33.
9-Construction of drain and CC road from Bilal Qureshi house to Bittu Tea Stall house and CC drain construction in Chuchubhai lane in Ward No. 33. 10- Construction of CC road and drain from Master Shakeel house
Construction of road in Ward No. 28, in the lane from contractor Ajay Goyal to Vijay Sharma, opposite DAV Roorkee.
29- In Ward No. 38, Shyam Nagar, RCC drain construction work from Rakesh Kumar house and pond towards Gopal Garden.
24- Ward No. 20 Various locations where drains are blocked and have collapsed, requiring urgent repair. Damaged drain construction work.
30- Floor and wall painting, plastering, gate and shutter cladding, etc. work in the Health Section store located at the Municipal Corporation Roorkee office.
33- In Ward No. 8, interlocking tiles installation work at various locations in the Tehsil complex.
25- Fencing work along the canal within the Roorkee Municipal Corporation area.
Construction of drain and CC road from Anoop Vermas house towards the old Tehsil police station in Ward No. 31
Ward No. 12 Road and drain construction work with interlocking tiles from Bhupendra house to Danish house in Shakumbari Enclave Phase 1, Lane No. 3.
21. Ward No. 24 Construction of interlocking tile road and drain in Sahib Singh Sainis lane from Yogesh Saini house to Pandit Ji house.
Ward No. 21 Construction of drain and road from the Peepal tree to the culvert.
Construction of road and drain in the internal lanes of Eidgah Enclave in Ward No. 37.
Construction of interlock tile road and drainage system in Ward No. 27, Sukhdev Nagar, from the main road to Pradeep Chawlas house, and construction of drainage system on both sides from Adesh Kumars house to Satyapal Singhs house in Sanjay Gandhi Co
Ward No. 16 Road and drain construction work from Rajesh Kumar and Rajendra houses to Dr. Damodar and Deepak houses.
9. Ward No. 17 Interlocking tile construction work from Manoj Sharma Ji house to Naresh Saini Ji house
Construction of the boundary wall of the Roorkee Municipal Corporation office.
6. Ward No. 12 Road and drain construction work with interlocking tiles from Sharma house towards Dhirendra house in Shakumbari Enclave Phase 2.
Construction of a tin shed, installation of interlocking tiles on the platform, and other related works at the Roorkee Municipal Corporation office.
Ward No. 11 Drain construction and road elevation work on both sides of the road from Akashdeep Temple.
Construction of road and drain from Hydel Office towards SD College in Ward No. 32
Ward No. 22 Construction of a road with interlocking tiles from Lane No. 14 to the crematorium