Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.2 LAccepted-Finance | ₹37.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹38.5 L+₹1.4 L (3.76%)Accepted-Finance | ₹38.5 L+₹1.4 L (3.76%) | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance 19 2 2ND FLOOR INDRA VIKAS COLONY NORTH WEST DELHI DELHI 110009 | NORTH WEST DELHI | DELHI | 110009 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | BHARDWAJ CONSTRUCTION & B.M SUPLLYER L1 | M/S RD INFRA L2 |
|---|---|---|---|---|---|
| 1.01 | Excavationinfoundationfor retaining,breastwallsetc, inall typesofsoils and rocks includingall lead, lift anddisposal of surplusmaterial asper direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 806 | Cum | 300 ₹2,41,800 Lowest | 372 ₹2,99,832 |
| 1.02 | Concretewithcement, coarsesandand40mmgaugestoneballast in proportion1:4:8 in foundationsand floors includingsupplyof allmaterial, labour andT&Petc. required for proper completionof thework. asper drawings and technical specifications Clause 802, 803, 1202 & 1203 | 80.6 | Cum | 5,000 ₹4,03,000 Lowest | 5,351 ₹4,31,290.6 |
| 1.03 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C. grade M 20 Nominal mix (1:2:4) | 7 | Cum | 6,200 ₹43,400 Lowest | 6,429 ₹45,003 |
| 1.04 | Plain/reinforced cement concrete in substructure completeas per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m R.C.C grade M 20 | 257.1 | Cum | 6,900 ₹17,73,990 Lowest | 6,953 ₹17,87,616.3 |
| 1.05 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS
1786:2008 clause no. 1.6) | 20.18 | tunne | 62,000 ₹12,51,160 Lowest | 63,884 ₹12,89,179.12 |
| 1.06 | Provinding and Fixing sing Board /wall painting with letter writing abd Photography complete in all Respects. | 1 | job | 2,000 ₹2,000 | 1,970 ₹1,970 Lowest |
Tender Value
₹46.2 L
EMD Value
₹1.4 L
Closing Date
30 Mar 2026, 5:00 pmClosed
Municipal Commissioner NNR
nagar nigam Roorkee
1. Construction of an RCC drain from Lane No. 10 on Paniyala Road towards the pond near the railway culvert.
2026_MCNNR_93338_1
967/NNR/2025-26
Open Tender
Civil Works
Item Rate
120 days
Nagar nigam roorkee
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Municipal Commissioner Nagar Nigam
₹1.4 L
13 May 2026
18 Mar 2026
1 Apr 2026
18 Mar 2026
30 Mar 2026
18 Mar 2026
Excavationinfoundationfor retaining,breastwallsetc, inall typesofsoils and rocks includingall lead, lift anddisposal of surplusmaterial asper direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Concretewithcement, coarsesandand40mmgaugestoneballast in proportion1:4:8 in foundationsand floors includingsupplyof allmaterial, labour andT&Petc. required for proper completionof thework. asper drawings and technical specifications Clause 802, 803, 1202 & 1203
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C. grade M 20 Nominal mix (1:2:4)
Plain/reinforced cement concrete in substructure completeas per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m R.C.C grade M 20
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6)
Provinding and Fixing sing Board /wall painting with letter writing abd Photography complete in all Respects.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Termconditionfornalla03.pdf
Tender Documents • 1.60 MB
BOQ_110486.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .