Loading…
Loading…
2,647 results • Recent activity
Construction of Madhyan Bhojan shed at Primary School No-3 And 7.(3rd Attempt)
CONSTRUCTION WORK OF 250 MM AND 150 MM NP3 DRAINAGE LINES FROM(1)KHARANA JHAPA TO SWAMINARAYAN MANDIR IN WARD NO.4. (2) FROM BHANWAD MAIN ROAD TO SWAMINARAYAN NAGAR SHERI IN WARD NO. 7 AND (3)FROM INDIRA VASHAT TO AHIR NI WADI IN WARD NO. 9 UNDER THE 15 PERCENTAGE VIVEKADHIN GRANT FOR THE YEAR 2022-23.(6TH ATTEMPT)
CONSTRUCTION OF 600 MM DIA PIPE CULVERT AT BEHIND MELDI MATA TEMPLE VIVEKADHAM SOCIETY ROAD.(6th Attempt)
(1)PROVIDING, SUPPLYING, LOWERING, LAYING, AND JOINTING A 200 MM DIA. RCC (NP3) DRAINAGE LINE AT WARD NO. 7 ON SHIVNAGAR MAIN ROAD, AND (2)PROVIDING, SUPPLYING, LOWERING, LAYING, AND JOINTING A PVC PIPELINE AT WARD NO. 7 ON SHIVNAGAR MAIN ROAD AND SHIVNAGAR INTERNAL STREET UNDER THE 15 PERCENTAGE VIVEKADHIN GRANT FOR THE YEAR 2024-25.(8th attempt)
PROVIDING, SUPPLYING, AND LAYING OF WATER LINE AND DRAINAGE LINE, AND CONSTRUCTION WORK OF PRECAST PARAPET WALL AT MASUMDADA VADI-2, BHAGAVATI NAGAR-1, PRABHAT NAGAR-1, SCHOOL NO. 9, NEAR MAGANBHAI PUTLA-2, BARPARA-3, COMPOSED-2, UNDER THE MLA GRANT FOR THE YEAR 2023-24. (7th attempt)
CONSTRUCTION OF MADHYAN BHOJAN SHED AT PRIMARY SCHOOL NOS. 6, 12, AND 16. (5th attempt)