Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,467 results • Latest
Topography of river and CS-LS Survey Work of Earthen Dam, Contour and topographical survey of Upstream of dam and preparation of drawing of Bhadar-II Irrigation Scheme
Consultancy work for Under water photography, videography and survey investigation by DGPS of Design of Inlet Strcture and other miscellaneous works at UmiyaJalasay, village- Vanagala across river pushpavati And Planning of Khandosan colony and 4 others Irrigation Chowkis under sub-division office, khandosan
Unit Rate for Carrying out survey, Design and Preparing Estimate for Canal, Canal Structure, Drain Structure under the Panam Irrigation Division, Godhra (2nd Attempt)
Operation, maintenance, and repair of all civil, electrical, and mechanical components, including the Karannagar Pumping Station, civil structures, M.S. pipeline, and distribution network, ensuring efficient and reliable water supply to all outlets under the Karannagar–Dhadhusan Lift Irrigation M.S. Pipeline Project for a period of three years.
Providing and Fixing 315 mm Dia. HDPE Pipeline for filling Village Tank Old Survey No. 260 & New Survey No. 500 and of Village Kotdi, Ta. Vijapur, Dist. Mahesana @ Existing Scour Valve Ch.42.317 Km of Piyaj-Dharoi Pipeline Project.
Operation, maintenance, and repair of all civil, electrical, and mechanical components, including the Piyaj, Lodra & Rampura Pumping Station, civil structures, M.S. pipeline, and distribution network, ensuring efficient and reliable water supply to all outlets under the Piyaj–Dharoi Lift Irrigation M.S. Pipeline Project for a period of three years.
Restoration Work of Connecting RCC Pipeline Sabarmati Saraswati Link Canal at. Ch.13700 mt to Kahoda Tank At.Kahoda Ta. Unjha
Construction of New R.C.C. Slab Type VRB in Place of Existing Old VRB at Ch 3550 mt.of Branch Canal No.3 of SRBMC
Construction of New Slab Type VRB in Place of Existing Old VRB at Ch 2365 mt. of Branch Canal No.3 of SRBMC
Third Party Inspection / Project Management Agencies for the Services of Project Management, Construction Supervision and Inspection of Materials for Work of Reconstruction, Restoration and Strengthening of Ver-I Irrigation Scheme (Goddha Weir), Ta. Mandvi, Dist. Surat.
CONSTRUCTION OF RABARIKA CHECK DAM ACROSS SARIYAMATI RIVER NEAR VILLAGE RABARIKA TA. JETPUR DIST: RAJKOT
Carry out survey and preparation of detailed plans and proposals for Land Acquisition and Demarcation of the remaining submergence land under Hirpura Barrage
Consultancy Services to Examine Techno- Economic Feasibility and Detail Field Geological Survey, Planning, Designing and Preparation & Submission of Detail Estimate with Preparation of DTP and Evolution of PQ and Price Bid for excess rain water Dispose through pipeline from villege undel to Creek to Anand Moghari drain near villege undel Ta:Khambhat Di:Anand
Renovation & Repair work of Koriyani Bandhara Scheme of Lakhpat Taluka, District: -Kachchh.(Stage-II)
Consultancy Service to examine Techno-economical feasibility and carry out Detailed field and Geological survey, planning, Designing and preparation & Submission of Detail Estimate with Preparing DTP/Tender Notice with Evaluation of PQ & Price Bid for connecting Check Dams, Ponds and other water bodies in the near vicinity of 7 Km from scour valves for water distribution from Link-1-3 & 4 (Under Sauni Yojana Division, Rajkot) Pipe Lines of Sauni Yojana in Saurashtra Region of Gujarat State.
Constructing protection wall for Village pond at village -Kara, Ta: Valia, Di- Bharuch
Constructing a Flood Protection Wall at village Bhankhetar Ta. Jambusar Dis.: Bharuch
Constructing Protection wall for village pond at village -Manad , Ta- Bharuch ,Di-Bharuch
Constructing Protection wall for village pond at village ‐Tankari Bandar , Ta‐Jambusar ,Di‐Bharuch
Package work of Ta, Jambusar, Di-Bharuch. (Pkg-1)Work of pond in bhatha area at Village Shigam. (Pkg-2) Work of New pond in Marva area at Village Zamadi. (Pkg-3) Work of pond Near smashan behind Navinagari at Village Moradpur-neja. (Pkg-4) Work of pond in vanjara area sim at Village Moradpur-neja.
Annual Maintenance Of Earthen Dam and Spilway, HR Gates Also Filling Sand bag Etc. At Bantwa Kharo Water Resources Project for the Year 2026-27
M&R to Sariyamati MI canal system for Rabi 2026-27 Season in Jetpur Taluka
SECOND CALL:-Hiring RTO Passing Taxi Vehicle (1+6 person) with Driver for the Office of Deputy Executive Engineer, Irrigation Project Sub-Division No. 7/4, Bilkha for the Period of OCT-2026 To Sep-2027.
Construction of New Slab Type VRB in Place of Existing VRB at Ch 1540.00 Mt. of B.C No.3 of SRBMC.
Modernistion and Restoration work of M0L and its Distribution System of S.R.B.M.C
SECOND CALL :-Hiring RTO Passing Taxi Vehicle (1+6 person) with Driver for the Office of Deputy Executive Engineer, Irrigation Project Sub-Division No. 7/1, junagadh for the Period of OCT-2026 To Sep-2027.
M and R Work of Extended Vadnagar Distributory of SRBMC for Year 2026-27 (second attempt)
Restoration of CR (Sluice No.10), CR (Sluice No.13) of Kharola Branch Canal & Restoration of HR Cum VRB At Ch.0 mt of Chalindra Tank Feeder
Short Term Restoration Work of Nara Canal System Taluka-Lakhapat District-Kachchh.
Construction of Dajipura Checkdam across Amaravati River near village Dajipura, Taluka Valiya, District Bharuch
Construction of Chasvad-1 Checkdam across Kim river at village:Chasvad of Netrang,Dist.Bharuch.
Construction of Zarna -2 Checkdam across Kim river at village:Zarna of Netrang,Dist-Bharuch
Construction of Vankhuta (Pada/Vankol) Checkdam across Madavati River near village Vankhuta(Pada/Vankol), Taluka:- Jhaghadiya, District:- Bharuch
Construction of Zarna -1 Checkdam across Kim river at village:Zarna of Netrang,Dist. Bharuch.
Construction of Kabirgam-1 Checkdam across Kim river at village:Kabirgam of Netrang,Dist.Bharuch
Construction of Mota Anadhara Checkdam across Kaveri River near village Mota Andhara, Taluka:- Jhaghadiya, District:- Bharuch
Construction of Pathar Checkdam across Amaravati River near village Pathar, Taluka:-Valiya, District:- Bharuch
Construction of Sevad Checkdam across Tokari River near village Sevad, Taluka:-Valiya, District:-Bharuch
Construction of Anjoli Checkdam across Amravati River near village Anjoli, Taluka:-Jhaghadiya, District:- Bharuch
Construction of Ramkot Checkdam across Amravati River near village Amravati, Taluka:-Jhaghadiya, District:- Bharuch
Construction of Rajpara Checkdam across Ghanta River near village Rajpara, Taluka:-Valiya, District:- Bharuch
Construction of Vaghpura Checkdam across Local Kotar near village Vaghpura, Taluka:-Jhaghadiya, District:- Bharuch
Construction of Nahra Checkdam across Karad River near Village Nahra Taluka Savli, District: Vadodara
Earthwork in illegal Well U/S Left side embankment of Bhimdad dam
Miscellaneous work of inspection bunglow at bhimdad dam
Jungle Clearance ,Desiltingand Earthwork in Bhimdad Main canal
Annual Maintenance of Earthendam of Ghelo Itariya Dam Site for the Year 2026-27
Short Term Restoration work of RBMC & Minor 2 of of Nirona Medium Irrigation Scheme, Taluka-Nakhatrana, District:-Kutch (Yr.2026-27)
RESTORATION OF RIGHT BANK OF SHETRUNJI RIVER AT VILLAGE: JUNA SAVAR, TAL.: SAVARKUNDLA, DIST.: AMRELI (CH.2880M TO 4800M)
RESTORATION OF RIGHT BANK OF SHETRUNJI RIVER AT VILLAGE: JUNA SAVAR, TAL.: SAVARKUNDLA, DIST.: AMRELI (CH.0.0M TO 2880M)