Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,467 results • Latest
AJI-III IRRIGATION SCHEME. Repair & strengthening of LBMC & RBMC HR Room, Inspection bunglow & Generator room of Aji III Irrigation Scheme
BHADAR-1 IRRIGATION SCHEME. Construction of Box Type Culvert on Bhadar-1 Main Canal Section-2 Near Mota Gundala Village Near Balaji Hanuman Road( Ch.55430 mts of Main Canal).
BHADAR-I IRRIGATION SCHEME. Construction of C.T. Crossing cum Box Culvert At Bhadar Main Canal Ch.67146m and Ch.69596m in Bhadar Sectin-3, Dhoraji
AJI-II IRRIGATION SCHEME. Main Canal Clearing for Rabi 2026-27 Season & Pre-Kharif 2027 Season in Aji-II Irrigation Scheme
Dismantling, Fabrication, Erection of Drive Unit Assembly Cover, Hoist platform Cheqd Plate and Dismantling, Supply and Erection work of Coupling Magnetic brake, 10 HP Diesel Engine, Dog Clutch, Forward Reverse Gear Box Etc and Put into properly Running Condition with align all parts including cost of gas cutting, welding, labours, materials, tools, tackles, scaffolding and transportations, paint etc as per specification and Actual site situation & Instruction of Engineer ln charge at kakarapar Left Bank Canal. Ta-Mandvi, District-Surat.
Dismantling existings parts of Radial Gate and Providing, Fabricating and Erecting New Gate leaf assembly, horizontal girders and Arms assembly with necessary Approach ladders Replacement of Clad plates of Side wall and seal beam Replacement of Stiffeners of yoke girder for Radial Gate size 15.545 m X 14.02 m - 09 nos Replacement of Yoke Girder assembly (6 Nos) and Thrust block (3 Nos) for repairing of radial gate No. 7,8,9,3,4 and Replacement of rubber seal of existing stoplog gates as per the Drawings and Specifications for Karjan Irrigation Project.
Replacement of Vertical Gate No. 1, 2, 3, 5, 9, 10, 11, 13 and 14 (Size:30 X 15 -9 Nos.) of Varansi Water Reservoir Project as per Drawings, specifications and instruction of engineer in charge
Construction of Box Drain on Main Canal at Ch.49475 Mt of L.B.M.C (Sathara Section)
Services for Annual general maintenance of earthen dam at Ukai. (2nd Attempt)
Providing and fitting of new chequered plate of Foot bridge, Entrance Gate with height barrier, New Hand railing on trailing wall of both side by dismantling old, Providing and fitting of new various size angle type steel ladders, New railing on all intermediate and end Pedestal Pier and Repairing of ERU covers and other Misc. work of Radial gate size 41` x 27` - 20 Nos of Machchhu-3 Irrigation Project. (Dist- Morbi)
Providing and Erecting Highmast, LED Streetlight or Floodlight, Octagonal Pole, Pole box, Cable, Stabilizer, Panel, Siren and Other Electrical Works At Indrasi Irrigation Project and Navalpur Waste Weir. (Dist : Sabarkantha)
Repair and Renovation of Khorana pipe canal network at village- Khorana (3rd Attempt)
Construction of Inlet structure at Ch.96.800 km on IP side of Sujlam Suflam Spreading Canal
Providing Restoration and Protection work of Inlet structure at Ch. 91.470 km on IP side of Sujlam Suflam Spreading Canal
M & R work of Canal System at Wadhawan Bhogavo-1 (Nayka) Irrigation Scheme For The Year 2026-27.
Providing under water diving services for various works activities at stop log gates groves No 7 ,9 and 14 at Ukai dam
Fifth Attempt) Repairing/Restoring and strengthening of Downstream face of wasteweir, Both side Abutment & wing wall and Additional apron including bar wall at wadhwan Bhogavo-2 (Dholidhaja) water resource scheme for the year 2025-26
Maintenance and Repaire of Lift irrigation scheme of Suchit juni kachali daba vibhag udvahan Piyat mandali, Juni kachali Ta Uchchal Dist. Tapi.
Maintenance and Repaire of Lift irrigation scheme of Shree Shrumjivi udvahan Piyat Manalim,Naranpura Ta Uchchal Dist. Tapi.
Improvement work of Dadhaliya S.M.No.2 in bet n ch. 0.00 to 1105 mt. from Mankudi Minor ch. 4950 m. of KLBMC.
Constructing WBM Road between Ch. 43.020 to 43.520 Km (I.P) and Ch. 62.680 to 64.080 Km (S.R) on Sujlam Suflam Spreading Canal.
Providing and fixing new gauge plates and warning cum sign board at various locations of Sujalam Sufalam Spreading Canal Ch. 27.700 to 68.400 km
Providing pucca rubble pitching work in between Ch. 2500 mt. to Ch. 2650 mt. of Lunawada Distributory of KLBMC
Restoration of 13L & 16 Tail Minor and Its Sub Minors of 24/R Distributory of PMC of Ta.Shahera Dist. Panchmahals
Deepening and Improvement of well at village Movachhi (Parona Faliya) Ta.Bardoli Dist.Surat
Constructing a checkdam at village Bilkhadi Ta.Mahuva Dist.Surat
Scheme of Drilling Bore (by DR Rig) with Solar Pump to the Tribal beneficiaries at various Villages of Ta. Palsana, Dist. Surat. (Year 2025-26).
Providing Various Services for Minor Irrigation Scheme in Mandvi and Umarpada taluka for monsoon 2026 under panchayat irrigation Division, Surat
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 3450 mt to 6000 mt.
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 10230 mt to 15000 mt.
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 0.00 mt to Ch. 3450 mt.
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 15000 to 21400 mt.
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 21400 mt to 25000 mt.
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 30000 mt to 35000 mt.
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 25000 mt to 30000 mt.
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 35000 mt to 40000 mt.
Improvement of Existing Irrigation Infrastructure work on DRBMC Between Ch. 6000 Mt.to 10230 Mt.Ta.Vapi Dist.Valsad
Improvement Of Existing Irrigation Infrastructure works on DRBMC Between Ch. 40000 mt to 45540 mt.
Construction of 05 Nos Recharge Borewells in Rukmawati Source Development Scheme (By Rotary Rig) in Mandvi Rural Area of Mandvi Taluka of Kachchh District.(2nd Attempt)
Providing New Toilet Block & Renovation of Inspection Bungalow at Ghodadhroi dam site,Village: Zikiyari, Taluka:Morbi, Dist:Morbi
Engineering, Procurement and Construction (EPC) Work for Integrated Irrigation, Drainage and Water Infrastructure Modernization Project in Barda Ghed Area Phase-2 Package-4: Upgradation of Visavada XX-Bar Wall through Hydraulic Modification by Installation of Rubber dam Ta. Porbandar, Dist. Porbandar including Operation and Maintenance for 10 years.
Engineering, Procurement and Construction (EPC) Work for Integrated Irrigation, Drainage and Water Infrastructure Modernization Project in Sorthi Ghed Area Phase-2 Package-4 : Upgradation of Madhuvanti TR through Hydraulic Modification by Installation of Rubber dam Ta. Porbandar, Dist. Porbandar including Operation and Maintenance for 10 years.
Construction of 3 MLD WTP with Raw Water Connection for Dharoi Dam Region Development Project including Operation and Maintenance for 5 Years.
Irrigation Purpose Necessary Work of Hadmatiya Minor Irrigation Scheme Year 2026-27
ERM Work For LBMC Ch. 9500 TO 13250 Mt. and Its Network of Mukteshwar Irrigation Scheme Year 2026-27
Construction of New Aqueduct at Ch.59267 m of ULBMC on Chhipan Khadi.i.
Construction of Pipe Type Canal Syphon at Ch.40320 mt on U.L.B.M.C.
Construction of Pipe Type Canal Syphon at Ch.41958 mt on U.L.B.M.C.
Flood Damage Restoration of Lining from ch. 0.00 m to ch. 230.00 m,ch.270.00 m to ch.734.00 m & ch.1330.00 m to ch. 1360.00 m on Amalsadi Main Canal And ch.5685.00 m to ch. 5715.00 m, ch.12285.00 m to ch. 12315.00 m & ch. 12835.00 m to ch. 12865.00 m on RIgth Bank Branch canal of Ver-II Irrigarion Scheme.
Annual Maintenance Of Jungle Cutting And Misc. Work Of Kakdiamba Irrigation Scheme.