Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,467 results • Latest
Remedial work due to seepage in between Ch. 1350.00 mt to 2500.00 mt. Bhadar Main Canal.
Constructing WBM Road in Between Ch. 37000 m to Ch. 40650 m of Bhadar Main Canal.
Remedial work due to seepage in between Ch. 0.00 mt. to 1300 mt. Bhadar Main Canal.
Strengthening work of earthen dam, left and right training wall at Bhadar dam.
Remedial work due to seepage in between Ch. 1100 mt. to 2400 mt. of Motighoda minor of Lunawada Distributory of KLBMC.
Rehabilitation work of Earthwork, lining AND CD work of Bhadar Main Canal in bet n ch. 39275 to 40650 mt.
Providing W Metal Beam Crash Barrier at SR side in between Ch. 13890 mt. to Ch. 14185 mt. of Bhadar Main Canal.
Underground Pipe line for Filling of Hardaspur village Tank from DO 2R of Pattan S.M. of Bheshawada Minor from Sonela Distributory of KLBMC.
Improvement work of Sada S.M. in bet;n Ch. 0.00 to Ch. 1290 mt. from Ch. 6500 of Hadmatiya Distributory of KLBMC. (3rd Time Invitation)
Construction of Compound Wall at Khanpur Colony.
Rehabilition work of Earthwork, lining AND CD works of Vardhari Distributory in bet n Ch. 10500 to 12300 m.
Remedial work due to seepage in between Ch. 15450 mt. to 16750 mt. Bhadar Main Canal.
Remedial work due to seepage between Ch. 7735.00 to 8125.00 mt of KLBMC.
Rehabilitation work of Earthwork, lining and CD works of Bhadar Main Canal in bet n Ch. 36500 to 37920 mt.
Improvement work of Pattan S.M. in Bet n Ch. 0.00 to 2000 mt. from Ch. 4100 m. of Bhesawada minor of KLBMC.
Hiran-2 Irrigation Scheme, Annual Maintenance of Hiran-2 Dam for year 2026-27
Protection work to Expose Basalt Rock D/s side of Ukai Dam in front of Gate No.4 and Gate No.14 at Ukai Dam Ta.Songadh Dist.Tapi.
THIRD-PARTY INSPECTION for the work of ‘Watershed Development of Sabarmati River Banks with waterbody from Shahpur Bridge to Mota Chiloda Bridge Ta- Dist- Gandhinagar (Phase-6)’
Providing, Intalling, Testing and Commissioning of Dam Instrumentation System for Damanganga Reservoir Project.
Desilting and Jungle cutting At Earthen Portion Of Karad Dam for year 2026-27
Restoration of Inlet Structures on Service road at Ch. 76766 m.,Ch.79409 m.,Ch.77250m and Ch.79900 m. of PMC
Third Party Inspection for the work of Engineering, Procurement and Construction (EPC) Work for Designing and Construction of Ged Barrage, Protection work & other allied activities across river Sabarmati between Hirpura barrage &Lakroda weir, Ta. Prantij, Dist. Sabarkantha including Operation and Maintenance for 10 Years.
General Annual Item Unit Rate for the various emergency work under the Jurisdiction of Drainage Division Gandhinagar. (3rd Attempt)
Providing standard Form and Stationary at Office (2nd attempt).
KHARO IRRIGATION SCHEME:-Repairing of C.C Lining and various Structures of Kharo left bank feeder main canal.
Preparation of Contour Map, L- Section And C-Section Of Rajawal, Kharo And Hanol Irrigation Scheme
Providing Xerox and Map Printing, Colour Xerox etc for Deesa Irrigation Division, Deesa (2nd attempt).
Providing Book Binding work (2nd Attempt).
Service Charge for Outsourcing Manpower Request, Regarding Damanganga Yojana Section No.1 Madhuban Colony (Second Time)
SUPPLY INSTALLATION TESTING COMMISSIONING OPERATION & MAINTENANCE OF REAL TIME STRUCTURAL HEALTH MONITORING INSTRUMENT SYSTEM AT UKAI DAM PROJECT.
Geotechnical Studies to determine Optimum dredging Profile in River Tapi, Upstreme of Singanpor Weir, Gujarat.
Resurfacing to Approach Road of Harpal Sagar (Brahmani 1) Irrigation Scheme.(Third Try).
Survey work for converting unlined canal into lined canal system and soil profiling for lining work of Machhu-1 Irrigation Scheme.
Constructing pipe culvert at ch. 37213 ft. on Navakhal minor ex. Adas distry under jurisdiction of BISD Borsad, Anand
Constructing R.C.C. Box type VRB @ Ch.10500’ ft of Anklav Sub Minor Ex. Navakhal Minor.
Construction of Lift Irrigation scheme at Village : Kharedi-2 Tal: Kaprada Dist.: Valsad
Restoration and Strengthening of Ishwariya MIS. Ta. Kutiyana and Dist.Porbandar (3rd Attempt)
Strengthening work of bhada village tank near village bharvada at Ta. and dist. Porbandar (3rd Attempt)
Construction of Lift Irrigation scheme at Village : Malghar-1Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Vaddha Tal: Kaprada Dist.:Valsad
Construction of Lift Irrigation scheme at Village : Malghar-2 Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Ozarda- 3 Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Hanmatmal Tal: Dharampur Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Ozarda-1Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Ozarda 2 Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Rohiyal Jungle Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village :Jamaliya-1Tal: Dharampur Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Manala Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Kharedi-1 Tal: Kaprada Dist.: Valsad
Construction of Lift Irrigation scheme at Village : Jamaliya-2 Tal: Dharampur Dist.: Valsad