Loading
Loading…
Loading…
2 results • Latest
Rerouting of underground Fire Pipe Line at NABI Campus
Earth work in excavation, by mechanical means(hydraulic excavator)/manual means in foundation, trenches of drains at all levels, depth, lifts etc including dressing of sides and ramming of bottoms lift , including getting out the excavated soil and disposal of surplus excavated soil as directed, including dewatering etc during excavation within a lead of 500m. A. Many Places excavation will be done manullay due to space constraints and HT cabling line, trees, DG sets, etc. plesae verify during site visit.
Water Tank Cleaning Works at NABI
Please Enable Macros to View BoQ information