Loading…
Loading…
91 results • Recent activity
Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82.675 and Km 82.925 on NH-244 in the UT of Jammu and Kashmir on EPC mode
Short term and permanent rectification works of damaged stretches, as per the recommendations of IIT Bombay, along with the balance works of the project, namely Rehabilitation and Up gradation of section from Km 242.00 to Km 298.00 of NH 4 AN
Short term and Permanent rectification work of damaged stretch as per IIT Bombay recommendation on the project Rehabilitation and Upgradation of section from Km 206 to Km 239.425 of NH 04 in the UT of ANI at the Risk and Cost at EPC Contractor
Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57.500 of NH-127B and ending at existing Km 108.750 of NH- 217 (Length-29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya
Road reconstruction and Slope protection work at 39.50 km near Mahanadi and Valley side restoration work at 37.00 km near Daragaon Devi Mandir of NH 110 old NH 55 during the FY 25 to 26 under NHIDCL on EPC Mode in the state of West Bengal
Short term improvement and Routine Maintenance of Finch Corner-Kaziphung Ukhrul Road section of NH-202 from existing Km 522.860 to Km 538.730 Total length 15.87 Km Pkg-03 in the State of Manipur on Item rate basis in the FY-2025-2026 6th Call