Loading…
Loading…
91 results • Recent activity
Annual Repair and Maintenance of Hunli-Anini Road from Km 37.500 to Km 53.500 in the State of Arunachal Pradesh
STMC for (a) from Km 61.100 (at Lava More) to Km 79.700 (at Algarah Bypass) i.e. Pkg VA-(i) and (b) from Km 25.600 (at Barbot) to Km 26.100 (at Nimbong) i.e. Pkg- IV-C under the jurisdiction of PMU-Kalimpong, NHIDCL,in the State of West Bengal.
Construction of 2-laning with Hard shoulder of Peren-Dimapur section of NH- 129A from Design Km 173.850 to Km 190.850 (Length - 17.000 Km) in the State of Nagaland on EPC mode (Package-V) under NH (O)-TSP
STMC work from 0 km to 43 km NH 110 Including the provision for Deployment of Machineries and Incident management in the district of Darjeeling under NHIDCL on Percentage Rate Contract B
Performance based Maintenance Contracts (PBMC) work of Asian Highway 02 (Ch. 0.000 to 1.500) from Nepal Border Mechi Bridge and approaches on India-Nepal border linking Kakarvitta in Nepal and Panitanki in India in the state of WB in FY 25-26
OTI work of existing Bypassed section of Jolaibari Belonia of NH 108A from km 3.8 to km 4.45 Total existing Length 650 m in State of Tripura in FY 2025 26 on percentage basis and work order basis