Loading…
Loading…
91 results • Recent activity
Improvement and Widening to two lane with Paved Shoulder of NH 13 15 from Design Km 0.000 to Design Km 24.819 Brahmakund T junction to Kamlang T Junction Design Length 24.819 Km Pkg 01 in the state of Arunachal Pradesh on EPC mode.
Short Term Maintenance and Rehabilitation work of 2 lane with PS highway from Km. 368.000 to Km. 468.000 of Rudraprayag to Helang on NH7 (Old NH58) under M R Head and at Risk and Cost of EPC Contractor in the State of Uttarakhand.
Periodical repair by way of Scarifying, Laying of WBM, Bituminous Macadam, Bituminous Concrete, Paver Blocks, Installation of Traffic Signs, Markings Other Road Appurtenances including fixing of Pipe Culverts, Protec. Works from 138to193 onNH-244
One Time Improvement of existing road from km 61.100 to km 65.080 of NH-29 falling in Dokmoka Town on Item Rate basis in the State of Assam in FY 2025-26
STMC works between Km 238.78 to Km 253.88 (Bhuja to existing Patharkandi Bypass),Km 263.28 to Km 264.78 (Kachubari to Chandkhira Grant Pt II) on NH 8 (New) at the Risk and Cost of the Concessionaire in Assam in FY-25-26
Short Term Maintenance Contract (STMC) Work for maintenance/ repair of existing section of NH-15 from Orang Village (Ch. 90.000) to Near Tezpur Medical College and Hospital (133.000)(Pkg-3) in the State of Assam