Loading…
Loading…
150 results • Recent activity
M and R to both side abutment and wing wall of Lykol sluice from ch 1.20 km to 1.50 km at Lykol Embankment Vill- Balughat in Block-Ratua-II, Gp and P.S-Pukhuria, Dist.-Malda
Repair and Maintanence of Raincut and Ghogs of Mahananda Embankment Barsoi branch in between ch 23.500 KM and 24.850KM for a length of 265m at Village-Islampur, GP Kharba, Block Chanchal-I, PS-Chanchal, Dist.-Malda under MESD-II
Maintenance and repair of rain cuts over Left Fulhar Embankment of River Fulhar, in different places Within Chainage 6.00 Km to 8.00 Km under GP Islampur, Block- Harishchandrapur II, PS Harishchandrapur, Dist Malda
Supply of Labour including carriage, placing etc. for flood preparedness work to the left fulahar Embankment in Block-Ratua-I, P.S.-Ratua, Dist- Malda. Sambalpur Primary School G.P.- Mahanandatola in Block-Ratua-I, P.S.- Ratua, Dist-Malda.
Restoration of existing damaged protection work on the right bank of river Fulahar for a length of 40 m down stream of Sambalpur Primary School G.P.- Mahanandatola in Block-Ratua-I, P.S.- Ratua, Dist-Malda.
Maintenance and Repair to the raincuts and Ghoges of Left Fulahar Embankment at ch. 28.00 km to 29.00km at G.P- Debipur within Block-Ratua- I, P.S- Ratua in Dist-Malda