Loading…
Loading…
150 results • Recent activity
Maintenance and repair of left Fulahar embankment in between ch 19.90 to 20.90 Km near Ho- Gopal Ghosh ) for a length of 450m including 3 nos ramp in block- Harishchandrapur-II, P.S.-Harishchandrapur, Dist- Malda.
Palliative protection work to the left bank of river Fulahar near ch 12.600 km for a length 40 m GP Doulatnagar , Block-Harishchandrapur-II, PS -Harishchandrapur Dist-Malda( Reach-I)
M and R of damaged left Fulahar Embankment in between ch 18.850 Km to 19.130 km (HO-Anesur Rahaman to Bhanu Ghosh ) for a length of 180m in Block-Harishchandrapur-II, P.S.-Harishchandrapur, Dist.-Malda
Maintanance and Repair to the raincuts and strengthening of Left Fulahar Embankment at 30.50km to 31.50km Surjapur G.P-Kahala within block Ratua-I, P.S-Ratua, Dist-Malda
Supply of Fine Sand and Polythene bags for flood preparedness work for the Left Fulahar Embankment Sub-Division No-III within Block-Ratua-I, P.S-Ratua in Dist-Malda
Restoration of bank on right bank of river Mahananda for a length of 25.00 mtr. Infront of EllahabadMaszid at village- Elahabad of G.P.-Maharajpur in Block-Ratua-II, P.S.-Pukhuria, Dist.-Malda