Loading…
Loading…
1,584 results • Latest
IMPACT PAD 'H' TYPE (75X100X1300), Part No - C6503007A001SKSP, CLAMP BLOCK (20-0594), Part No. - HC2000594AL
Repairing of M/s Wilo M and P make pump, Model GST 250/300, during Monsoon in Kakri Project.
Mechanical overhauling of 2 Nos. Single Roll crushers and Reciprocating Feeders of CHP Kakri Project
Spare for Air Conditioner
SEAL O RING-part no.4400157566, BOLT-part no.4400188337, STUD-part no.4400188338, PLATFORM AS-part no.4400273357, SUPPORT-STEP RUBBER-part no.4400277410, HOSE AS-part no.4400278116, TUBE-part no.4400278190, HOSE-part no.4400279578, VALVE GP SOLENOID AND RELIEF-part no.4400282332, HOSE AS-part no.4400282452, HOSE AS-part no.4400283585, SPACER 13.5X19X27-MM THK-part no.4400287488, SLEEVE-part no.4400287489, TUBE AS-part no.4400289451, TUBE AS- part no.4400289453, VALVE GP ACCUMULATOR CHARGING- part no.4400292446, HOSE AS-part no.4400294029, LOCKNUT M16X2 - THD-part no.4400294297, PLATE-part no.4400294298, CASE AS TRANSMISSION-part no.4400294348, HOSE AS-part no.4400295124, HOSE AS- part no.4400295134, HOSE AS-part no.4400295152, HOSE AS-part no.4400295156, HOSE AS-part no.4400297539, HOSE 21 CM EACH-part no.4400299725, MOUNT-FLEXIBLE- part no.4400300630, PLATE AS-part no.4400300631, PLATE AS-part no.4400300633, BRACKET AS-part no.4400300634, RETAINER-SPRING-part no.4400300637, TUBE AS-part no.4400300638, TANK AS RADIATOR-part no.4400301813, VALVE GP CONTROL-part no.4400301854, TUBE AS-part no.4400301781, TUBE AS-part no.4400301852, TUBE AS-part no.4400301853, TUBE AS- part no.4400301814, TUBE AS-part no.4400301780, TUBE AS-part no.4400301809, TUBE AS-part no.4400301785, PLATE AS-part no.4400301805, BOSS-part no.4400301806, BOSS-part no.4400301807, TUBE AS-part no.4400301782, TUBE AS-part no.4400301811, CLAMP T BOLT-part no.4400301812, TUBE AS-part no.4400301810, HOSE AS- part no.4400295151, BOLT-part no.4400301808
Foam making Branch Pipe or Fire suppression foam or similar compounds as per IS 2097 (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Repairing of 02 Nos. Main Hydraulic Pumps of REL750E Drill Machine at Nigahi Project.
Offloading the work of de-mounting and mounting of Engines of Excavation HEMMs on as and when required basis .
Offloading the work of re-pairing of A-frame housing in 03 nos. CAT 777E Dumpers of Krishnashila Project.
Facility Management Services - LumpSum Based - Industrial; Operation of pumps and regulating of controlling valves of pumps installed for dewatering of mine water; Consumables to be provided by service provider (inclusive in contract cost)
CAAQMS with Weather Monitoring Station with 3 years Warranty and 5 Years CAMC
Repairing and Denting works of various sub-assemblies of BWS70KL Water Sprinkler and Hydraulic Excavator at Auxiliary Section OWS Nigahi Project.
Supply of AC spares for BEML make BWS70 model Water Sprinklers.
Repair and rewinding of 100 KVA 11KV/440V transformer and maintenance of other transformers at Jhingurda Township
Annual maintenance contract for 2 nos. Air Conditioner fitted at PC 2000 (EXC-2997) hyd. Shovel working at Bina project for the period of one year
Daily cleaning of 02 Nos. Draglines (Gaurav and Saurav) of Bina Project for 305 days.
Leasing of Electric Vehicles (Long Term) - Wet Lease; As per tender documents requirement; 2250 KMs per month and 12hrs per day; 60 Months Lease; As per tender document
Providing one no. cricket practice pitch at Pragati Maidan at CWS Jayant
INJECTOR GL 1 REPLACEMENT, Part No. 114909, GLC 2200 CONTROLLER, Part No. 24N468, GLC 2200 CONNECTOR 1 AND PINS 12, Part No. 24P686, PR SWITCH, Part No. 115124, PRESSURE GUAGE 0 TO 500 BAR, Part No. C11620, HOSE SAE 100R2, 3 BY 8 INCH ID, D10, 2000 LONG, Part No. C11631, 5000 LONG, Part No. C11633, VENT VALVE KIT, Part No. 77X540, MOTOR KIT, Part No. 24T862, STAND ALONE PUMP RESERVOIR 24V DC, Part No. 77X000, SEAL KIT, Part No. 24T860, CONTROL BOARD REPLACEMENT KIT, Part No. 24T867, GLC 2200 WIRING HARNESS 5FT, W FLYNG LEAD, Part No. 24P314, GL 1X GREASE INJECTORS 3 INJECTORS, Part No. 114903, INJECTOR GL1, 4 POINT, Part No. 114904, 5 POINT, Part No. 114905, ELBOW CONNECTOR 1 BY 8 INCH NPT, Part No. C11611, ELBOW CONNECTOR 1 BY 4 INCH NPT, Part No. C11612, FOLLOWER PLATE, Part No. 77X500, TANK 60LB, Part No. 77X535
Cleaning, checking and replacing / repairing of HT Panel, HT/LT Ring collector, HT/LT shoe insulator replacement blowering and cleaning of motors and generators including electrical panels of 06 Nos. Shovels (04 Nos. BE-195 and 02 Nos. 182M Marion) a
PALLET; HAND, HYDRAULIC, 2T, LIFT: 2M, JACK HYD; 10TON, JACK HYD; 50TON, HYD LCK RAM SYS, JACK HYD; 100TON, HYD LCK RAM SYS
BIT SUB 58281809
Facility Management Services - LumpSum Based - Residential; Housekeeping, As per NIT; Consumables to be provided by service provider (inclusive in contract cost)
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio; The offered vehicle should not have completed 3 years from the date of first registration from RTO at the time of last date of submission of Bid; Less than 100000 Kms..
Customized AMC/CMC for Pre-owned Products - SIEMENS MAKE Magnetom CI MRI Machine; Siemens; Comprehensive Maintenance Contract (CMC); As per Scope of Work; No
Construction of roadside concrete shoulders at Krishnashila Project.
Providing RCC drain to divert mine water from entering in coalyard in mine area at Krishnashila Project.
Annual Maintenance Contract of Cabin AC of Komatsu make Payloader WA600 working at Block-B Project
Repairing/Maintenance and Other work related to 100T Dumpers and Water Sprinklers for a period of one year
Supply of Critical Spares of 20/90 Dragline
Repairing/ replacing of clutch assembly, flywheel and engine service filters of New Diesel Tanker UP64CT-4165 at Kakri Project.
Repair and Maintenance of substation to comply DMS violations as per the requirement at Dudhichua project
Misc. Civil works near diesel filling point of east section at Dudhichua Project
Hydrants (Landing Valve) as per IS 5290 (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6944854 Dated : 28-11-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 13200.66 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Vocational Training Services - Version 2 - offline; 4; Service providers location; Postsecondary vocational school
Stacked Tip Nozzles (Q3), High Pressure Fire Fighting Hose with Delivery Couplings as per IS 14933 (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6944643 Dated : 28-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Stacked Tip Nozzles Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 187483.12 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Spares For Meditron make Switches
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Hydraulic Excavator or JCB and hydraulic tipper for cleaning of accumulated coal at CHP Jayant; Hydraulic Excavator or JCB and h..
Repairing of 04 nos. reversing valve of 24 96 Dragline, 06 nos. Reversing valve and 06 nos. propel brake cylinder of BE 195 Rope shovel working at Bina Project.
Dismantling of G.S. Sheets, Providing RCC slab and providing and fixing of aluminium showcase in DType quarters of Sector B and C of Dudhichua Project
Repair of tank, leaf spring and other body parts and replacement of worn out parts of Mobile Fogging machine MP66H 2358 and MP66H 2359 of Block-B Project.
Repairing and Rewinding of TRANSFORMERS during monsoon period
Repairing/rebuilding of worn out of housing of Boom, Arm and eye of upper structure then co-axial line boring to its original size in PC2000-8(K-1) Hydraulic shovel at Amlohri Project
Repairing of Power Ladder, counterweight, Railings and Catwalk of 2 Nos. PC 2000-8 Hydraulic Shovels(K-1, and K-2) of Amlohri Project.
HOSE 381-12 Part No. 2074222, HOSE END, FR 2-8 Part No. 1032836, HOSE END FR5-12 Part No.1034545, HOSE END FR 5-4 Part No. 1081659, HOSE END FR 5-5 Part No. 1033131, HOSE END FR 5-6 Part No. 1034421, HOSE END FR 5-8 Part No. 1033255, HOSE R 2-8 Part No. 1032828, 1033140 HOSE Part No.1033140, HOSE R 5-4 Part No.1081641, HOSE R5-5 Part No. 1033239, HOSE R 5-8 Part No.1033930, TEE 8 RT X 5 Part No.0968056, TEE, PIPE PFM .38 Part No. 0807435, CONNECTOR 5-497 X 5 Part No. 0882381, MALE CONNECTOR Part No. 0875961, CONNECTOR 88FT X 5 Part No. 0837229, CONNECTOR 8- 8GT X 9 Part No. 0837211, CONNECTOR 88 GT X 9 Part No. 0994839, CONNECTOR 8FT X 5 Part No. 0845752, ELBOW 4-4CTXS MALE Part No. 0837113, ELBOW 5-4CT X 5 Part No. 0837202, ELBOW 5-4 VTK5 Part No. 0931179, ELBOW 5CT X 5 Part No. 0837199, ELBOW 8-8 CT X S Part No. 0938483, ELBOW 8CT X 5 Part No. 0845736
Fabrication / Repair of 04 Nos. RHS platform and repairing and fitting work of Engine Guard 04 Nos. of CAT777E Dumpers at OWS Nigahi Project.
Repairing of damaged gear box cover of Hoist intermediate shaft and main gear wheel of 24/96 Krishna Dragline at Nigahi Project.
Shifting and Diversion of Existing 33KV and 6.6 KV HT OHL F no 3,4,11 and 13 towards North side and F no 15 towards East side from existing place near Tapovan s/s for providing space to HOE working in that areas for OB and Coal Exposure.
Facility Management Services - LumpSum Based - Industrial; Cleaning transportation handling of fire extinguishers to various HEMMs at regular interval, firefighting related works at coal heaps and cable handing during operation and marching of Shovel..
Upkeeping of Indira Bhawan and Sports complex in CWS colony at CWS Jayant for 120 days