163 live77 closing this weekmost from ODISHA POWER TRANSMISSION CORPORATION LIMITED and Odisha Power Transmission Corporation Limited
163 results • Latest
Design, Engineering, Supply, Erection and Commissioning of Strengthening of Existing Overhead Lines within 60kms of Coastal belt Districts in priority towards mitigation projects for construction of Disaster Resilient Power Infrastructure from SDMF. Lot-III- i: Strengthening of 132kV Paradeep-Kendrapara DC line. ii: Strengthening of 132kV Paradeep-Tirtol DC line.
Stringing of HTLS Conductor in existing 132kV Burla PH Katapali Ckt I and II line after dismantling of ACSR Panther Conductor in Sambalpur District on Turnkey contract basis.
Design, Engineering, Supply, Erection, Testing and Commissioning work towards Construction of 400 KV D/C Quad line from proposed NTTPP, NLC, Talabira to 400/220/132/33 KV Grid Sub-Station, Lapanga along with Construction of 02 Nos. of 400 KV bays at 400/220/132/33 KV GSS, Lapanga in the State of Odisha, on EPC contract basis.
Engineering, Supply, Erection, Testing and Commissioning works for AI based survey and maintenance of Transmission line of OPTCL.
E-TENDER FOR PROCUREMENT OF UNIFORM FABRICS FOR MALE EMPLOYEES OF OPTCL
Design, Engineering, Supply, Erection, Testing and commissioning of 2X500 MVA, 2x100MVA 400/220/33KV AIS Sub-Station with SAS at Unchaballi with associated 400 KV D/C LILO LINE from 400KV Kaniha-Bisra D/C line CKT-I and II to proposed 400/220/33KV GSS at Unchaballi, 220KV LILO in D/C from TTPS-Joda line to proposed S/s at Unchaballi with bay extensions at Turumunga on EPC Contract basis.
Design, Engineering, Supply, Erection, Testing and commissioning 400 KV Quad Moose Double Circuit DC Transmission line on Double Circuit and Multi-Circuit towers from the existing 400/220 KV Pandiabil PGCIL Grid Substation to the proposed 400/220/33 KV Grid Substation at TSSEZ, Gopalpur Approx-157.363 km on EPC Contract basis.
Engineering, Supply, Installation, Testing and Commissioning works for Construction of One 400 kV Dia with erection of one 500MVA ICT at 400/220 kV Grid Substation, New Duburi on Turnkey Contract Basis.
Design, Engineering, Supply, Erection, Installation, Testing and Commissioning of 4 X 100 MVA, 220/33 kV GSS at Padepadar along with 220 kV DC Line from 220/33 kV GSS at Padepadar to exist. 220 kV S/Y UIHEP, Mukhiguda and 2 Nos. of 220kV Bays extensions at 220 kV S/Y UIHEP, Mukhiguda
Supply of 8 Nos 63 MVA, 220/33 KV Power Transformer
Augmentation of 220/132/33KV Atri Substation capacity from 320 MVA to 480MVA at 220 kV level through construction of 220 kV and 132 kV 3rd 160MVA Auto Transformer Bay and 60 MVA to 110 MVA at 132 kV level through construction of 132 kV and 33kV 3rd 50 MVA Power Transformer Bay in Khurda district on Turnkey contract basis
PROCUREMENT OF 500 MVA 1 Ph Auto Transformer 7 nos as per tender specification.
As per the attached documents.