Loading…
Loading…
29 results • Latest
Reconstruction with geometric improvement of two lane to 2-lane with paved shoulders configuration from existing Km 52.200 to 92.880 at Tanakpur to Belkhet of NH-125 on EPC mode under improvement of NH connectivity to Char Dham (PKG-1) Reg. Maintanan
Providing Supply of Back Hoe Loader and Tipper for Opening Communication at KM 31 to KM 60 of NH-309A Year (2026-27).
Providing Supply of Back Hoe Loader and Tipper for Opening Communication at KM 61 to KM 93 of NH-309A Year (2026-27).
Providing Supply of Back Hoe Loader and Tipper for Opening Communication at KM 01 to KM 30 of NH-309A Year (2026-27).
Short Term Management Contract on NH 305 Sainj Luhri Aut Road between Km 0.000 to 23.000 in the state of Himachal Pradesh
Short Term Maintenance Work from Km. 196.00 to Km. 200.00 on NH 534 309 old 119