Loading…
Loading…
29 results • Latest
Landslide treatment work from Ch. 269.900 km to Ch. 270.214 km (Crown portion at Totaghati) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26 - under EPC mode
CONSULTANCY SERVICES FOR FEASIBILITY STUDY, PREPARATION OF DPR AND PRE-CONSTRUCTION SERVICES FOR UPGRADATION OF ZOJILA -KARGIL - LEH ROAD NH-01 FROM KM 232.00 NEAR PASHKUM TO KM 391.00 IN THE UNION TERRITORY OF LADAKH
Treatment of 01 nos of landslide location at Ch. 91.125 to 91.415 (near Gulabghati) on NH- 109 (old NH 87 ) in the state of Uttarakhand under Annual Plan 2025-26
Treatment of 16 no of landslide location on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Construction of 4 laning of Rishikesh Bypass from Design Chainage km 529.750 Near Teenpani Flyover on NH7 to Design Chainage km 542.420 Near Kharasrote Bridge passing through Bhattowala and Dhalwala Village in the State of Uttarakhand Design Length
Treatment of 11 No. of landslide location on (Kotdwar to Dugadda) of NH-534(old NH-119) in the State of Uttarakhand under Annual Plan 2025-26