Loading…
Loading…
29 results • Latest
Consultancy Services for Preparation of DPR for Widening to Four lane from Dhalli Km 156.507 to Rampur Km 275.000 section of NH 05 in the State of Himachal Pradesh.
TREATMENT OF 04 LANDSLIDE LOCATIONS CH 102pt66 KM TO CH 102pt885 KM ON PITHORAGARH TAWAGHAT ROAD AND CH 4pt680 KM CH 4pt880 KM CH 4pt890 KM CH 5pt250 KM AND CH 5pt733 KM CH 5pt833 KM IN TAWAGHAT GHATIABAGARH SECTION OF NH 09 OLD NH 125 IN THE UK
Consultancy services for preparation of DPR for Construction of 4-lane Rishikesh Bypass PKG-2 from Design Chainage 542.420 Near Kharasrote Bridge to Design Chainage 548.820 Near Brahmpuri in the State of Uttarakhand Inchuding 02 Tunnels.
Consultancy Services for Authority Engineer for supervision of Rehabilitation and up-gradation to 2-lane configuration of NH-309A from km 73.66 Udiyari bend to km 103.25 Kanda Existing Chainage 80 to Km 110 of NH-309A in the State of Uttarakhand.
Construction of 4L PS Sri Muktsar Sahib bypass from existing Km 269.960 of NH-354 to existing km 39.280 of NH 754 on EPC mode in the state of Punjab