Loading…
Loading…
4,806 results • Latest
As per NIT/BOQ
As per NIT/BOQ
As per NIT/BOQ
As per NIT/ BOQ
As per NIT/ BOQ
As per NIT/ Boq
As per NIT/BOQ
As per NIT/BOQ
As per NIT/ BOQ
As per NIT/ BOQ
As per NIT/ BOQ
As per NIT/BOQ
Permanent Restoration work of PMGSY Divsion Thathri
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
As per NIT/BOQ
As per NIT/BOQ
Construction/Up-gradation of Rural Roads under PMGSY including maintenance for Five year after construction-PMJANMAN
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Supply of vehicle on monthly hire basis for the use of PMGSY PROJECT DIVISION OFFICE SHIKARIPURA for the year 2026-27(For AC Vehicle)
Construction of road from Bramanpara to Avirampur 6 KMTrafficable Condition under Dhaniakhali Block
Package no ADBIICHABR09 Construction and Five year maintenance of High Level Submerssible bridge on MSH-09 Talodhi to Wadhona Umargaon Sonapur Tukum to Sindewahi Taluka Border Road at CH 2/325 Tal. Nagbhid Dist.Chandrapur
Permanent Restoration of road from Janglote - Bhed Balode, Package No. JK07-78, Block Kathua, District Kathua (Adv. Cost Including GST) (Length 6.50 Kms) Under Capex Budget 2025-26 (2181-PMGSY Roads)
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Providing Security Services to Dist Laboratory PMGSY MRRDA Amravati
Saljora Sitala Mandir to Adibasi Para via Sech Bandh at Saljora within NARAYANGARH Block in Paschim Medinipur District Length 1.485Km NIT 10 SL 13 2nd Call
Construction of CC Road from Mitipur Jinnah sk house to mitipur gp at Mitipur G.P. under Raghunathganj-II Block (Length of the Road 1.50 Km) in Murshidabad District.
Repair Of Barakot Simalkhet To Padasosera MR (Patch Work)
Preparation of DPRs for Roads as per PMGSY IV guidelines
Design and Preparation of Detailed Project Report for Bridges Including cost estimate
PMGSY-III- 2023-24 (Batch-1) Package No. KR13104 Anthikkad Block, Thrissur District including Maintenance for Five years after construction. (Balance work Re-Tender)
Restoration of road from Chinsurah station to Taldanga Under Chinsurah Mogra Block
Khorikabad pitch road Dojidhora hari mandir within MEDINIPUR SADAR Block in Paschim Medinipur District Length 1.42Km
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis (Motorable path only) by way of clearance of Snow, slips/crate work likely to be occurred during the financial year 2026-27 on 1.T01 Darhal to Upper Simbli vi
Restoration of roads under the jurisdiction of PMGSY Division Budhal on emergency basis (Motorable path only) by way of clearance of Snow, slips/crate work likely to be occurred during the financial year 2026-27 on 1.Saj Bassan to Dakhan via Remo
Hewagan to Dhanmasta Road under SASCI
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Sahaspur Station to Kharra underIndus
Chakkuldiha T03 Under Taldangra Block
Construction of road from Charfirozpur Ferry ghat to Kalu Sk house Under Raninagar-I Block (Length of the Road 1.900 Km)
Construction of road from Noadapara more to Naushad Sk house via Pakurtala to Luthu Sk house Under Raninagar-I Block (Length of the Road 1.690 Km)
Construction of road from Prodidanga Sahojsanga CLub to Sisarmura More Under Hariharpara Block (Length of the Road 1.650 Km)
Construction of Concrete Road from Dongalon pitch road to Mongalpur pitch road under Sahaspur GP within Indas Block in the District of Bankura (Length 3.500 km)
Post 5 Year Maintenance Work through e-Marg from Chenra - Sitapur within Binpur II Block (Road Length 6.720 km) in the District of Jhargram
Repair Block Top Road from Chapai Durga Mandir to PMGSY Road Panighata under Kaliganj GP within Kaliganj Block
Temporary Restoration of roads on emergency basis by way of clearance of slipssnow likely to occur during the financial year 2026-2027. Karole to Kumet, Package No. JK04-226, Stage-II, Phase-IX, Block and District Ramban, Length 26.15Kms