Loading…
Loading…
4,806 results • Latest
BIRPUR BALIGRAM MASJID TO PURATANPARA MASJID under Nakashipara Block
Tepul Harihar Das house to Pubali Rice mill
PADMA BILA BAGDOB UPTO CHAKU DANGA
Repair Black Top Road from Modak Hardware to Ganidas House Nowdapara via Hospital Main Gate Under Tehatta GP within Tehatta-I Block
Bhekutia Bazar to Srirampur Batlala Ichamati
From Tapas Biswas to Khalpara Switchgate under Nakashipara Block
From Kanchkuli Kalitala to Dahakhola Haritola Under Nakashipara Block
Upgradation of road from Mahesherpara PWD Road to Guchaidanga Ghat Abhimukh Under Karimpur-I Block
Flood Damaged Restoration of road from Kangapal to Patappur under Nepura GP within Binpur-I Block in the district of Jhargram.
Permanent Restoration of road from T03 Potkhah Km 42nd of Srinagar Baramulla Uri NHWay to Mangam_Package No. JK03 2016
Permanent Restoration of road from T02-Battal to Barigarh, Package No JK14-467, Length 8.400 km, Block Majalta under UT Capex 2025-26
Repairing Renovation of Road from Gosaipur to Indran within Gulandar-I G.P. Surun-I G.P. under Itahar Block in the District of Uttar Dinajpur. (Length of the Road 8.510 Km)
Construction of new road from Bharna PWD road to NHI road via Raniganj within Belan G.P. under Goalpokhar-II Block in the District of Uttar Dinajpur. (Length of the Road 2.100 Km)
Preparation of Detail Project Report (D.P.R) for District Panchayat Training and Resource Center (DPTRC) Hostel Building at Jhargram
Construction of road from New Black Top road required from Makhanpokher Satsoli Mahanpokher-2 Goalgaon Bajar via Sapotbari vollage, Dumuria, Kashibari Under Goalpokhar-II Block (Length of the Road 5.950 Km)
Construction of road from Dalimgaon to Uttar Gouripur via Pachakandar under Kaliaganj Block (Length of the Road 10.700 Km)
6th year Renewal Work of Roads of Package No KS-09-13 (GENERAL) in Mudigere Constituency of Chikkamagaluru District Under Namma Grama Namma Raste Yojane-III
Restoration of roads under the jurisdiction of PMGSY Sub Division Chenani JK14 659 JK14 270 JK14 306 JK14 617 JK14 660
Restoration of roads under the jurisdiction of PMGSY Sub Division Chenani JK14303 JK14 318 JK14 715 JK14 717 JK14 316 JK14 363
Restoration of roads under the jurisdiction of PMGSY Sub Division Ghordi JK14308 JK143006 JK14320 JK14208 JK14502 JK14194
Restoration of roads under the jurisdiction of PMGSY Sub Division Ghordi JK14729 JK14 3005 JK14199 JK14 319 JK14 657 JK14 619
Restoration of roads under the jurisdiction of PMGSY Sub Division Ghordi JK14505 JK14616 JK14202 JK14286
Ukhral to Bhingara Road, Package No JK04453, Length 13.10 Kms
Permanent restoration of road Sirthangle Katyara, Package No JK04-216 by way of construction of Crated Wall, RCC/Kucha Pucca Walling, Scupper, GSB, WBM, Back cutting.
Hiring of vehicle Mahindra Bolero / Scorpio base variant or above Model 2023 June Onwards for the period from April 2026 to March 2027 including GST along with driver of Banihal Locality on the monthly Hire basis for official use of Executive Engin
Permanent restoration of Guzriyal-Bakhipora road Package No. JK0856
Permanent restoration of Shaloora-Aloosa road Package No. JK08159
Supply of vehicle on monthly hire basis for the use of PMGSY PROJECT SUB DIVISION OFFICE SHIVAMOGGA for the year 2026-27(For AC Vehicle)
Restoration of roads under the jurisdiction of PMGSY Division Poonch on emergency basis i.e. (Motorable paths only) by way of clearance of snow/slips/crates works likely to occur during financial year 2026-27 (BATCH-2)
Restoration of roads under the jurisdiction of PMGSY Division Poonch on emergency basis i.e. (Motorable paths only) by way of clearance of snow/slips/crates works likely to occur during financial year 2026-27 (BATCH-1)
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Permanent restoration of Zirhama-Jumagund road Package No. JK0894
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Permanent Restoration of Road from Dhar Road to Kalmoh in Km 2nd RD 800 and Km 7th RD 200, Pkg No JK14-340 Length 6.300 Kms Block Khoon
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Construction / Upgradation of Road/ CD works including maintenance for Five year after construction-UPG.
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year