Loading…
Loading…
5,621 results • Latest
Construction of Septic tank to Govt collage Girls hostel at Pathikonda Village & Mandal in Kurnool District
Major and Minor repairs to Govt BC Boys hostel at Maddikera Village of Maddikera Mandal in Kurnool District
Restoration of toilets facilities at Govt B C Welfare hostel in Pathikonda Village and Mandal in Kurnool District
Providing approaches with retaining walls to high level bridge across Paleru vagu near Sivavaram on road from Akumalla to Banaganapalli of Owk Mandal
Selection of an Agency for laying of 24F ADSS Optical fiber Cable in the APSFL Phase-I Network
Laying of CC Road and Culverts from EP No. 697/A1/1 to D No. 2-127/57 at Vikalangula Colony in Ward No. 08 in Madhruwada Zone. (Reserved for SC ST Vaddera Societies)
Rectification of Potholes and filling up of them with concrete in the Ease Zone-2 of Kadapa Municipal Corporation
Improvements to CSP Road to Nadukuru to JK Gummada via Kimmi Rushingi (SH-104) from Km. 0/0 to 1/0, 2/2 to 3/0. in Parvathipuram Manyam District (3rd Call).
Supply, erection, testing and commissioning of 2nd circuit stringing on existing 132KV DC/SC line from 220KV SS Kalikiri to 132KV SS Romplicherla (30.70km OH Transmission line) and 1No. 132KV bay extension at 220KV SS Kalikiri and 1No. 132KV Bay extension at 132KV SS Rompicherla in Chittoor district
Laying of 20 ft. width Road from Dibbalapalem to Mayfair and Oberoi Projects in Bhogapuram mandal of Vizianagaram District. Est. Cost Rs. 330..00 Lakhs
Construction of foot path bridge on bank canal at kota serilankapeta H/o kota village of K.Gangavaram mandal, Est Rs.20.00 lakhs
Construction of Village Health Clinic at Sivarampuram of Nandigam Mandal . Estimate Cost: Rs. 53.00 Lakhs
Construction of Village Health Clinic at Loharibanda of Mandasa Mandal Estimate Cost: Rs.50.00 Lakhs
Construction of Village Health Clinic at Kalaparthi of Burja Mandal Estimate Cost: Rs.49.00 Lakhs
Construction of Village Health Clinic at Kavitagraharam of Nandigam Mandal . Estimate Cost: Rs. 55.00 Lakhs
Providing FHTCs in Mahendrawada H/o Mahendrawada GP (by utilizing existing infrastructure and Retrofitting Augmentation) in Anaparthi Mandal, Est. cost Rs.49.86 / 60.73 Lakhs
Augmentation of DW Facilities in Gontivanipalem Ho Gontivanipalem GP of Addateegala Mandal of ASR District Est. Cost 9.50 Lakhs
Construction of CC Road from D.No 6-6-1, Aadarsh Colony to Sri Nagar Colony 80ft Road, 35th Division, in Ananthapuramu Municipal Corporation.
SUPPLY OF CUPRO NICKEL TUBES FOR SEAL OIL COOLERS OF STAGE III
Shifting and erection of LT, 11 KV and 33KV Overhead Power lines in E15 Road Extension to Old National Highway Mangalgiri including dismantling of existing lines and poles obstructing road development works in Amaravati Capital City.
Supply, installation, testing and commissioning of 11Nos i9 Laptops and 11 Nos i7 Laptops for official utilization in CE/Power Systems Wing, CE/APSLDC Wing, Asst CIDO/IT/Application wing and Asst CIDO/ERP wing Vidyut Soudha/Vijayawada and 45Nos i7 Laptops for all SEs and up to EE/Level at Transmission Wing
Repairs to Kirloskar KOEL Generator's (82.5 KVA capacity) at Mahanadu Road No: 7& 19 Sewage Treatment Plant (STP) under AE-3 Section of Tadepalli Urban of Mangalagiri Tadepalli Municipal Corporation under Municipal General Funds
Procurement of OT Linen/OT Dresses for Staff and Green Cloth to Operation Theatre, BIRRD Trust Hospital, TTD, Tirupati
Construction of CC Roads and Side Drains in Chalappalem Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Madduluru Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Rudravaram Village of S.N.Padu (M)
Laying of cc road from dno:6-5-985 to dno:6-5-986 to 80ft road at sri nagar colony ward secretariat 52,35th division of AMC
Entrusting (17Nos) outsourcing works engaged through the contractor for providing Skilled & Un-Skilled workers i.e., Data Entry Operators (Typing/Accounting works) and office sub-ordinate /Attender etc., on "MAN POWER SUPPLY CONTRACT" basis in various offices of Srikakulam District for a period of 36 months
Construction of CC Roads and Side Drains in M.Vemulapadu Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Tellabadu Village of Maddipadu (M)
Construction of CC Roads and Side Drains in M.Vemulapadu Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Gorlamitta Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Endluru Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Enikapadu Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Machavaram Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Mangamuru Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Kamepallivaripalem Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Rudravaram Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Chalappalem Village of S.N.Padu (M)
Providing Additional Amenities to Community Hall in H.Nidamanuru (V) of N.G.Padu (M)
Construction of CC Roads and Side Drains in Pidathalagudipadu Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Mynampadu Village of S.N.Padu (M)
Construction of CC Roads and Side Drains in Tellabadu Village of Maddipadu (M)
Construction of CC Roads and Side Drains in Madduluru Village of S.N.Padu (M)
Providing additional amenities to the Community Hall in Chilumurulanka (V) of Kolluru (M) Est Cost Rs 10.00 Lakhs
Construction of GP Office Building in Chinapulivarru (V) of Kolluru (M) Est Cost Rs 10.00 Lakhs
Engaging of 1 No. 6MT Van Diesel/Petrol /Hybrid /CNG/ Bio-Fuel /EV or any type (preference to be given to EV) on Monthly hired basis for the use of Deputy Executive Engineer/District Stores/Simhachalam-2 in Operation Circle, APEPDCL, Visakhapatnam. The vehicle is under the control of the Superintending Engineer/ Operation/APEPDCL/ Visakhapatnam with a model 2019 and above for a Period of 11 months i.e., from 01.05.2026 to 31.03.2027
Improvements to the road NCS road to BC Colony via. lakshmipuram, Nagaram road from km 0/0 to 7/1 in anakapalli district. (3rd Call)
SDSTPS - 3X800MW - Removal of spill over ash on road between 1st and 2nd stage from work shop to ECCS switch gear room via stores and Wetting of road from coal gate to required areas with water tanker for the period from the month of April- 26 to March 27.
Improvements to the road Narsipatanam Chintapalli Sileru (R&B) Road to Sarabhavaram (Via) Butchimpeta from Km 2/0 to 6/0. in anakapalli district. (3rd Call)