Loading…
Loading…
3,604 live1,812 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
3,604 results • Latest
Operation of Ehiapur PWSS
Operation of Bara Kulgachi PWSS
Operation of Khanji PWSS
Maintenance of Kunda PWSS
Operation of Koshigram PWSS
Operation of Jagadanandapuri PWSS
Operation of Karajgram PWSS
Operation of Moregram PWSS
Operation of Khajurdihi PWSS
Operation of Nanagar PWSS
Operation of Sribati PWSS
Operation of Pandugram PWSS
Operation of Gidhgram PWSS
Operation of Baghtona PWSS
Operation of Auria PWSS
Operation of Jajigrami PWSS
Operation of MERA PWSS
Operation of Murgram PWSS
Operation of Mulgram PWSS
Operation of Akhara PWSS
Operation of Amul PWSS
Operation of Baichi PWSS
Operation of Ankhona PWSS
Construction and Commissioning of 200mm dia three phase Tube Well on Annual Rate Contract basis in Sandy strata with 05 Year OandM including defect liability period of two years in urban/rural area of District Bharatpur
Rate Contract of Drilling of 125mm (M S Pipe) Nominal diameter bore hole for Hand Pumps and installation of India Mark-II Hand Pump in Combination Strata complete with material and labour charges in urban/rural area of District Bharatpur.
Recovery and Reconstruction of PWS Scheme from Haresay Jhora to Munshi Dhura and Karbutar under Sangsey GP, Block-II, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
Recovery and Reconstruction of PWS Scheme from Mali Khola to Kamshi Forest Village, Bong GP, Block I, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
Annual Maintenance of Water Supply Scheme i.e. Makrouli Khurd District Rohtak for 12 Months from the Date of Commencement (Pumping Machinery and Electrical Work)
Recovery and Reconstruction of PWS Scheme for Suruk Khasmahal (Three Habitation) Block-I, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF)
Recovery and Reconstruction of PWS Scheme from Sisney Khola to Samthar Bazar, Block-I, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF)
Construction Water Treatment Plant at Existing Old Water Works in Rajound, Consturction of RCC Sump Well at Canal, Rising Main 200mm i/d DI Pipe Line for Old Water Works Rajound Town Tehsil Rajound and District Kaithal
Estimate of Balance Work for Road Works, Laying of Balance Sewerage Network, Construction of Manholes, Laying of HDPE Pipe from IPS to MPS and Rising Main from CCT to Saraswati Drain for 4.50 MLD Sewerage Treatment Plant in Village Siwan Tehsil Siwan
A/Mtc. work for various villages
Annual Maintenance of Larji HEP
Recovery and Reconstruction of PWS Scheme for Okherbotey Jhora to Dun under Lolay GP, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
Comprehensive operation and maintenance and Special repair of 110 Nos Ward level Piped Water Supply Schemes (Non Quality) & 16 nos PWS Scheme based on item rates; constructed by the Public Health Engineering Department including payment to the pump operators, electricity bill for five years. No. of schemes: WLS(Non Quality): 110 PWS(Non Quality): 16 P H Division Jhanjharpur
Realignment of water supply pipe line coming under the alignment of road widening from NH-1 to Mushkoo Drass by Project Vijayak 55-RCC (GREEF) (Under BRO deposit).
Recovery and Reconstruction of DWS Scheme from Kali khola to Khani under Seokbir Khani G.P 42 Constituency, Block-I Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).