Loading…
Loading…
3,604 live1,812 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
3,604 results • Latest
Rate Contract for Installation of Single Phase Tube Well 150mm Nominal dia bore hole in Combination Strata complete with material and labour charges with 05 Year OandM including 02 year defect liability period of in urban/rural area of District Bhara
Work of Replacement of old pipeline by DI Pipeline Malah Head works to Sewar Fort and Sewar Fort to DEPOT Area, Kanjoli line at AMN DEPOT Bharatpur, including defect liability period of one year at Division Bharatpur.
Repair of M S Fabricated Bridge of P S Tank of Filtration Plant No 1 at Sitlee under own soruces 2026-27
Recovery and Reconstruction of DWS Scheme from Pareng Khola to Pedong and its adjoining area, Pedong GP, Pedong Block, Kalimpong District under 40th Constituency under (NDRF) and (SDRF).
Construction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain- 50 nos. and Making soak pit 1.0m diameter 2.0 metre deep with dry brick honey comb shaft with bricks of class designation 100B for well-50 nos. for School, SC/ST Tola, Govt. Anganwadi and water scares tola/habitation in P.H.Sub Division, Mashrakh & Sonpur at Saran District under P.H.Division, Chapra for the year 2026-27.
Construction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain- 50 nos. and Making soak pit 1.0m diameter 2.0 metre deep with dry brick honey comb shaft with bricks of class designation 100B for well-50 nos. for School, SC/ST Tola, Govt. Anganwadi and water scares tola/habitation in P.H.Sub Division, Chapra & Baniyapur at Saran District under P.H.Division, Chapra for the year 2026-27.
Recovery and Reconstruction of PWS Scheme for Upper and Lower Lolay Khasmahal, Block-II, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
Rate contract of providing lying jointing and testing HDPE/DI pipe line including defect liability period of one year at Division Bayana and Weir in Urban/Rural area District Bharatpur.
Supply, delivery, fitting and fixing of fabricated Stainless steel screening box net at SW and DW Suction side at CDDS main pumping station, Bangur, Jessore road, Dist 24-Pgs(North).
Withdrawing, repairing and lowering of sewerage p.m set no.2 (30kw) and line shaft of p/m set no 3 (30kw) patipukur pumping station, Lake Town, Dist 24-Pgs (North).
Recovery and Reconstruction of PWS schem from Chawa KHola to Relli and its adjoining area under Lolay G.P Block-ll Kalimpong ,District under National Disaster Response Fund (NDRF) and State Disaster Response Fund(SDRF).
Repairing, rewinding and overhauling of pumping machinery SW-3 (75 KW) on emergency basis at CDDS Main pumping station, Bangur under Eastern Mechanial Division, P.H.Engineering Dte. 24-Pgs ( N). (Pump Type- KRTK 350-5001758, UNGI-D)
Providing, Installation, Testing and Commissioning of 10000 GPH X 175 mtrs head HC pump set including other allied electrical/ electro-mechanical works at T/well cum P/s Raipur-III under Constituency Development Fund (CDF) Scheme.
Supply, delivery and lowering of Submersible Pumping machinery and cable for PH-II under Laukhali Patharghata W/S scheme, Block-Sandeshkhali-I under Eastern Mechanical Sub Division-I, PHE Dte. Dist- 24 Pgs(N).
Recovery and Reconstruction of PWS Scheme from Sethi Khola to Upper Khani, Block-I, Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).).
Repairing of plumber block bearing housing and pump bearing portion including re-alignment of vertical line shaft of P.No SW 5 (132kw) at CDDS main pumping station Bangur under EMD Phe Dte.
Recovery and Reconstruction of PWS Scheme from Khar Khola to Sadar Top Line Kumai G.P Gorubathan 44th Constituency Block Gorubathan Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
The GIS Mapping of Sewer network of leh Town
Estimate for Balance Work, Aug. of Existing Intermediate Pumping Station at Khairpur and all other works contingent thereto.
Recall Annual Maintenance of Water Supply Scheme i.e. Polangi District Rohtak for 12 Months from the Date of Commencement (Pumping Machinery and Electrical Work)