Loading…
Loading…
3,496 live1,685 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
3,496 results • Latest
Engagement of 01 (One) No. Peon cum Office Attendant under Group-D category on purely contractual basis for the office of the Superintending Engineer, Eastern Circle, PHE.Dte., (For the Period of 12 (Twelve) Months)
Repairing of Pump House and Cleaning of Pump House Premises of Bhatar Zone-II (5 Nos)Pump Houses with paint of Boundary Wall at Bhatar Block within Durgapur Sub-Division under Burdwan Division, PHE Dte.
Laying of Rising main in between Tube Well -2 (at OHR site) and Distribution Line and FHTC AND PIPE LINE AT JENARAR PARA under BHATAR Z-I PWSS in BHATAR Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. (SM/08033)
Providing balance FHTC and laying of HDPE pipe line along with approach raod and other ancillary works for Mandardihi PWSS of Bhatar Block under Burdwan Division.PHE Dte. (SM/14052)
Providing of Balance FHTC and restoration of damaged FHTC at Different AWC under BHATAR Block under Durgapur Sub Division under Burdwan Division. PHE Dte. (Project ID PH212239978S000)
Restoration of pipeline, Providing sluice valve, Painting and minor repairing of Switch room, Clearing compound premises ,Remaining FHTC, making temporary earthen road and repairing of old valve chamber of Orgram Zone-II Piped water supply Scheme ,
Repairing of Pump House of Bhatar Z 1 ( 2 Nos) Pump Houses with paint of Boundery Wall and repairing of Old Cholorine Room at OHR premises at Bhatar Block within Durgapur Sub Division (Burdwan North ) under Burdwan Division PHE Dte.
Providing Blance FHTC at Bhatakul piped Water supply Scheme under Durgapur Sub-Division under Burdwan Division, P.H.E.DTE. Block Bhatar, Dist.- Purba Bardhaman.
Repairing of bursting and Saddle Replacement and Ferrule wash of different dia. HDPE pipe of different location of Paschim Karampur Water Supply scheme and Shushuna Water Supply Schemes under Manteswar block under Durgapur Sub Division, P.H.E.DTE
Laying interconnection (Zone 2) and Road restoration at Bhatakul piped Water Supply Scheme, Under Durgapur Sub Division under Burdwan Division, P.H.E.DTE. Block Bhatar, Dist.-Purba Bardhaman.
Providing FHTC and land development of Khurul Piped Water Supply Scheme under Bhatar Block, of Durgapur Sub Division Under Burdwan Division. (SM/13549)
Upkeepment including Sweeping, cleaning maintenance of A.C machine Cleaning of Shurbs, Gardening and other miscellaneous work for the office of the Executive Engineer, Nadia Arsenic Division - I, P.H.E Dte. to be engaged through AgencyunderNADIPHED
Day to day Operation and Maintenance of different official works by providing necessary manpower etc. for the office of the Executive Engineer, Nadia Arsenic Division-I, PHE Dte. (for the period of 01.01.2027 to 31.12.2027)
Construction of Pump house , Land Development work , Road Restoration, Remaining FHTC at Bhatakul Piped Water Supply Scheme , P.H.E Dte. Block-Bhatar,Dist Purba Bardhaman.
Hiring of 15 KVA (12 KW) Diesel Generator set to provide power supply at the Office of the Executive Engineer, Nadia Arsenic Division-I, P.H. E Dte. Kalyani, Nadia for the period of 361 (Three Sixty One) days
Sinking of 250 x 200 mm. dia. 150 m. deep Tube Well by D.R. Rig method using UPVC pipe (CD) and UPVC deep Well Screen (RDS) under Central Circle, PHE. DTE. (1 No.) at Bolgona Railway Par (Replacement TW-III) and Pump House at beside mirickpara ICDS
Repairing of Distribution System pipeline,Saddle (UPVC), NewFHTC for KULNAGAR Vill.,BHATAR Z-II PWSS,Bhatar block,Durgapur Sub-Divn., Burdwan Division PHE Dte.
Auger Boring for laying of DI pipe at Bolgona Chandrapur PWD Road near 1 No. Pump house of Balgona PWSS at Bhatar Block.
Laying of Rising main in between Tube Well to Distribution Line (UPVC Pipe) at Kulnagar for Bhatar Zone II Pipe Water Supply scheme in Bhatar Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte.
Additional laying of pipeline at different habitations under the command area of Harop (Zone-II) PWSS of Bagnan-I block under Uluberia Sub-Division of Howrah Division, PHE Dte. (Location- Agunshi Bhunera Purnal)
Providing 48 Nos FHTC and laying of HDPE and UPVC pipe line for village of Shigram of Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Restoration of Concrete Road ,Providing F.H.T.C. at Karjjana piped water supply scheme of JJM in Bhatar Block , District Purba Bardhaman, Durgapur Sub Division under Burdwan Division, P.H.E. Dte.
Restoration of damaged pipeline, providing sluice valve, painting and minor repairing of Switch room, clearing compound premises, making temporary earthen road and repairing of old Valve chamber of Orgram Zone-1 Piped water supply Scheme , P.H.E Dte.
Construction of boundary wall, Intenal Pathway and Land Development including interconnection of Tube wells with DI pipes and Laying distribution pipeline at HW site of Augmentation of Bamunhati PWSS under Uluberia-II Block in Uluberia Sub-Div.PHE
Construction of approach road and land developments at HW and 2nd T.Well site of along with alternative laying of DI pipes under Hijlak PWSS under Bagnan-I Block under Uluberia Sub-Division of Howrah Division, PHE Dte.
Providing 48 Nos FHTC and laying of HDPE and UPVC pipe line for village of Majhergram of Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
FIXING OF DISPLAY BOARD WITH M.S STRUCTURE CONTAINING LAND DESCRIPTION AT DHENUA PWSS AND OTHER SCHEMES(64 Nos.) WITHIN MANTESWER , GALSI- II BLOCK UNDER BURDWAN DIVISION , PHE Dte.
Development of land of OHR site along with alternative laying of DI HDPE (PE 100, PN6) pipes, carriage of constructional materials to the Head Work site of Baniban (Zone-III) PWSS under Uluberia-II Block of Uluberia Sub-Division PHE. Dte.
Providing 15 Nos FHTC and laying of HDPE and UPVC pipe line for village of Dhanyakherur Majhergram PWSS for SAJAL GRAM of Manteswer Block under Burdwan Division.PHE Dte.
Construction of 2 storied switch room slope roof (3.6 x 3.0m) with water supply and sanitary arrangement including construction of boundary wall around 4th t.well site of Ajangachi PWSS of Amta-II block under Uluberia sub-division under Howrah div.
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground BasedPWSSforarsenicaffectedareasof Duttaphulia ZI Duttaphulia ZIIAranghata Z-II adjoining mouzas at Ranaghat II Block for the period of 361 Days under NADIPHED
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC)andIEP of Different Ground Based PWSS orarsenicaffectedareasof Garapota, MuragacchaZ-I, Muragaccha Z-IIBetna, GobindapurBhayna Z-I BhaynaZIIadjoining mouzasatHanskhali Blocktheperperiodof 361day
Emergent shifting of UPVC distribution pipe line and FHTC due to widening of WBSRDA road from Tushkhali ghat to Atapur Kenaram High School within Tushkhali water supply scheme, Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte.
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) andIEP of DifferentGround Based PWSS forarsenic affectedareasofJoypurItaberia, Nasra Zone I Nasra Zone-II adjoining mouzasatHanskhali and Ranaghat II Block for the perio of 361 Days underNADI
Repair and construction of Boundary wall 80 Mtrs. Construction of 2 No. HLT size i.e. 8.84 x 6.10 x 1.83 Mtrs. Laying of 200 mm i/d D.I. rising main 2700 Mtrs. From proposed water works to old existing water works
Beautification, gardening and allied work at Ramnagar, Baidyanathpur, Pansuili Head Works Site Mahal OHR site within Durgapur-Faridpur Block under deposit work Eastern Railway under RCFA Division-I PHE Dte.
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedareasoHalalpurKrishnapur Zone I, Matikumra, ArranghataZone Iadjoining mouzas at Ranaghat II Block for the periodof 361 Days underNADI
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedareasofRamnagar, Chupria Zone IChupriaZone II Mamjoani adjoining mouzas at Hanskhali Block for the period of 361 Days under NADIPHED
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedSabdalpur, Goalsalua Zone I, Goalsalua Zone II adjoining mouzas at Ranaghat -II Block for the period of 361 Days under NADIPHED
Emergency laying of DI pipe with interconnection work and allied work at Paraskhol to improve the water supply at Paraskhol area in Bahula GP within Pandabeswar Block Deposit work ECL Paraskhol under RCFA Division-I PHE Dte.
OandMofDistSystem and RisingMainPipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedareas of Dubli Zone I, DubliZoneII,Debagram,Dhanatala,Halalpur KrishnapurZone II adjoining mouzas at Ranaghat II Blockperiod361days
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedGobindapur Zone I, GobindapurZone II Gayespur Zone I, Gayespur Zone II adjoining mouzas at Santipur Block for the period of 361Day
Painting and minor repairing of Switch room, Clearing compound premises , making temporary earthen road and repairing of old Valve chamber etc of Gramdihi Piped water supply Scheme , P.H.E Dte. Block -Bhatar Dist Purba Bardhaman.
OandMDistsystemand Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSSfor arsenic affected Tarapur, Paschim Noapara, Radhakantapur, ParniamatpurKalaighata adjoining mouzas at RanaghatI Block for the period of 361 Days underNADI
Repairing and renovation of fifteen nos small house hold standalone community water plant at various places, place name-Piyariganj Adhibasi para, Telipara Adhibasipara, Telipara Kathalal vanga, Nobogram ICDS school, Ajoy pally Raghunath setu, Kathal
Repairing of distribution line, laying of HDPE pipe line, repairing of FHTC at Kalikamali village, Narayanpur village, Jamjuri village, Kashidanga village, Khayerbani village and Jamgram village under Jamgram PWSS under Barabani Block in the District
Emergency diversion work due to expansion of Bilpahari OCP area for smooth running of Water Supply within Bilpahari and its adjacent area at Kendra GP within Pandabeswar Block at Bilpahari ECL (Deposit Work) under RCFA Division-I PHE Dte.
Emergency repairing of Bursting, Chokage clearing, interconnection and other allied works at Bijoynagar and Dhasna village at Bijoynagar Housing (Deposit work) under RCFA Division-I PHE Dte
Urgent repairing of 200 mm dia rising main and distribution line, Installation of 15 nos street stand post at Kapistha, Kharabor and Domhani village under Sarsathali PWSS under ECL Begunia Colliery (Deposit Work) of Barabani Block in the District of
Emergency diversion work for 150 mm DI pipe near Jhanjra Colliery within Durgapur Faridpur Block for smooth running of water supply at Kuchdihi, Sirsha Palashbani village and adjacent areas (ECL Deposit Work Jhanjra OCP) under RCFA Division-I PHE D