Loading…
Loading…
19,493 results • Latest
Annual Operation and maintenance of Distribution pipe lines including FHTCs for Kuldiha Separate Zone of Bistupur Water Supply Scheme under RCFA Division-I PHE Dte. (For Nine Months)
Operation and Maintenance of Iron Elimination Plant at Maslandapur (Zone - I) W/S Scheme under Habra Sub-Division, P.H.E. Dte. For one year
Supply of Drinking water by Three Wheeler Motor Van Mounted PVC Tank to various water scarcity area including loading unloading of PVC tank from nearby source of water within different draught prone areas of Gangarampur Block in the District of D/D
WBPHED/EE/JD/e-NIT- 04/2026-27 (Sl.No.06)
WBPHED/EE/JD/e-NIT- 04/2026-27 (Sl.No.05)
Operation and Maintenance of Iron Elimination Plant at Habra Municipal (Zone-1) W/S Scheme under Habra Sub-Division, P.H.E. Dte. For one year
Rate contract for the construction of new open wells or deepening of existing open wells in jurisdiction of District Rural Division II Udaipur
Supply of Drinking water by Three Wheeler Motor Van Mounted PVC Tank to various water scarcity area including loading unloading of PVC tank from nearby source of water within different draught Prone areas of Kushmandi Block in the district of D/D
Rate Contract for work related to Installation of Single Panghat in the Jurisdiction of District Rural Division II Udaipur
Providing, installation, testing and commissioning of 400 ampere LT control panel-1no. alongwith allied works at pumping station Sounthian stage-1st
Operation and Maintenance of Iron Elimination Plant at Ayera ward no 1 W/S Scheme under Habra Sub-Division, P.H.E. Dte. For one year
Supply of Drinking water by Three Wheeler Motor Van Mounted PVC Tank to various water scarcity area including loading unloading of PVC tank from nearby source of water within different draught prone areas of Harirampur Block in the district of D/D
Providing, fitting, installation, testing and commissioning of 300 ampere LT control panel alongwith LT cables and other allied works at pumping station Baryal.
Design, fabrication, installation, testing and commissioning of 50 ampere LT control panel alongwith allied works at pumping station Spring Source Sounthian.
Restoration of road including alternative laying of DI(K-7) pipeline at Vill- Sherpur and Bhandargacha under Sherpur PWSS of Amta-I Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Road Restoration under Jal Jeevan Mission (JJM) for Birohi-I and Fatepur G.P. and Haringhata Block under Providing FHTC (Functional Househod Tap Connection) under Jaldhara/Jalswapna for Zone-III (Jalkar Bhomra), Part-II at Haringhata Block etc.
Balance work for revamping upgradation of the hydraulic parameters at Gobindapur Colony and Hijuli mauza in reference to Gobindapur PWSS and Hijuli PWSS under Nadia Arsenic Division-I,P.H.E. Dte as a part of Jal Jeevan Mission
Special repairing and restoration of distribution pipeline for functionalities of FHTC connection under Gobindapur Zone-I Piped Water Supply Scheme under Nadia Arsenic Division-I, PHE Dte.
Restoration of road including alternative laying of DI(K-7) pipeline at Vill- Purba Gazipur and Khasnan under UDANG ZONE-II PWSS of Amta-I Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Annual Maintenance estimate for water supply scheme group of 3 nos. villages i.e. Jondhi, Girawar and Rampura for the year 2025-26. OandM for the next 12 months
Annual Maintenance estimate for water supply scheme Akheri Madanpur for the year 2025-26. OandM for the next 12 months
Annual Maintenance Estimate for water supply scheme Mundahera Tehsil and District Jhajjar for the year 2025-26. OandM for the next 12 Months
Laying of additional pipelines under JJM at Garapota W/S Scheme in connection with Debagram W/ Scheme under Ranaghat-II block within Hanskhali Block Scheme under Nadia Arsenic Division-I, PHE Dte
Special repairing and retrofitting of Pump house and Boundary wall at Head work site and 2nd TW site of Augmentation of Kalyanpur Birampur PWSS of Bagnan-I Block in uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Supply, installation, testing and commissioning of 630 AMCCB at water supply scheme Padshahi-bagh
Annual maintenance estimate for water supply scheme Mangawas Tehsil and District Jhajjar for the year 2025-26. OandM for the next 12 months
Continuous monitoring and testing of water samples by supply of Chemical References and Consumable Gases (As and When Required) for analysing of water samples by ICPMS GCMS at Kalyani State Referral Laboratory under Nadia Arsenic Division-I, PHED
Day to day Operation and Maintenance of different official works by providing necessary manpower etc. for the office of the Executive Engineer, Nadia Arsenic Division-I, P.H.E. Dte. for the period 01.01.2026 to 31.12.2026
Repair, Renovation Painting work of Pump House No. 1, 2, 3 with Boundary Wall Ancillary work of Baniban PWSS at Uluberia-II Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Annual maintenance estimate for water supply scheme Birohar Tehsil and District Jhajjar for the year 2025-26. OandM for the next 12 months
OandMfor performing of day to day Laboratory activities including providing remuneration of laboratory personnel and calibration of instruments Operation, analysis, application support, training and maintenance and service of GC-MS/MS system etc.
Restoration of Cement Concrete Road from Mollickpool to Baragram via. Khaldhar with alternative laying of DI HDPE (PE 100, PN6) pipes of Joargorh PWSS under Uluberia-II Block of Uluberia Sub-Division PHE. Dte.
Islamgarh Annual maintenance estimate for water supply scheme group of 2 nos. villages i.e. Islamgarh and Bir-Chuchakwas Tehsil and District Jhajjar for the year 2025-26. OandM for the next 12 months
Extension of UPVC pipe line restoration of Concrete Road of Uttarpirpur PWSS under Uluberia-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Restoration of Flood protection work at Baima Nallah(Under Capex)
RegularUpkeepment of Mobile Laboratory Van complete with internal fabrication, refrigeration, exhaust system, air conditioning system, waste disposal system and fully equipped with instruments, devices, consumables, reagents. accessories etc.
Annual maintenance estimate for water supply scheme Palra Tehsil Beri District Jhajjar for the year 2025-26. (OandM for the next 12 Months)
WORK RELATED TO HAND PUMP REPAIR IN RURAL AREA OF BLOCK Girwa Sub Dn Udaipur
Hiring of 15 KVA (12 KW) Diesel Generator set to provide power supply at the Office of the Executive Engineer, Nadia Arsenic Division-I, P.H. E Dte. Kalyani, Nadia for the period of 01 (One) year
Unbranded Desktop Calculator with Liquid Crystal Display (LCD)
OandM of Distribution System and Rising Main Pipeline (CI/DI/UPVC) and Iron Elimination Plant of Different Ground Based Piped W/S Scheme for arsenic affected areas of HalalpurKrishnapur Z-I , Matikumra,Arranghata Z-I Ranaghat-IIblockunderNAD-IPHED
Upkeepment including Sweeping, cleaning maintenance of A.C machine Cleaning of Shurbs Gardening and other misc. work for the office of the Executive Engineer,NAD-I PHEDte. to be engaged through Agency under NAD-IPHED for the period of 01 year
OandM of Distribution System and Rising Main Pipeline (CI/DI/UPVC) and Iron Elimination Plant of Different Ground Based Piped Water Supply Schemefor arsenic affectedareas of Arranghata Z-II, Duttaphulia Z-I, Duttaphulia Z-II, Nasra underNAD-IPHED
OandM of Distribution System and Rising Main Pipeline (CI/DI/UPVC) and Iron Elimination Plant of Different Ground Based Piped WSScheme for arsenic affected areas of Beharia,Goalpur Z-I , Goalpur Z-II, Nabla, NrisinghapuratSantipurblockunderNADIPHED
Special Repair of Damage pipeline, house connection due to widening of road and other allied works at Betna and Muragaccha Zone-I Water Supply Scheme within Hanskhali Block under Nadia Arsenic Division-I, PHE Dte.
Construction and Commissioning of Open Well at Sutharo and Rana Rajputon ki Dhani Village Segdi G.P. Ranigaon
Deployment of Laboratory Personal at the laboratory under Haringhata WTP (Sub-district laboratory for Prandhara) at Kalyani,Nadia. for the period of 01 (One) year
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Bhayna Zone- I (Capacity-125 m3/Hr., Pressure Type ) Betna (Capacity-50m3/Hr., Pressure Type ) W/S Scheme under Nadia Arsenic Division - I P.H.E. Dte
Reparing and Restoration of damaged uPVC pipeline at Nazirpur-Habibpur Road in Birnagar (Ushagram) at Ranaghat-I Block of Ground Water Based PWSS for Birnagar W/S Scheme Nadia Arsenic Division-I, PHE Dte.