Loading
Loading…
Loading…
19,073 results • Recent activity
Construction of 3No. storage tanks of capacity 50000Lts Each for fire safety arrangements at sheshnag base camp during SANJAY 2026-2 (under Tourism Capex).
Construction of 1 No. RCC UGT, 1 No. Pump Chamber, Boundary wall in village Sultanpur for Harizan Basti (Near Railway line)
Laying of Pipe DI line
Laying of Rising Main and Distribution DI Pipe Line
Laying of 100mm i/d DI Pipe line
Repair of existing S/S tank at Old and 2nd water works, P/F of 400 KVA DG and 500 KVA Transformer at 2nd water works and all other works contingent thereto.