Loading…
Loading…
19,077 results • Recent activity
Temporary arrangement of drinking water facilities at different polling stations during WBLA General Election 2026 in Jhalda I Block (Part -A) under Purulia Mechanical Division, P.H.E. Dte.
Kajibas, Replacement of existing A.C/P.V.C pipe line to D.I pipe line, Block Mustafabad, Constituency Radaur, District Yamuna Nagar
Day to day operation and maintenance of Rest Shed (Situated above the Bankura W/S Circle Office) under Bankura Division, P.H.E.Dte. (wef.- 01.03.2026 to 28.02.2027) (One Year)
Repair to 5000 GPH x 250 meter head HC pump alongwith allied works at WSS Asher.
Day to day operation and maintenance for the Executive Engineer Office building and office premises under Bankura Division, P.H.E.Dte. (wef.- 01.03.2026 to 28.02.2027) (One Year)
Repair to 4000 GPH x 280 meter head HC pump alongwith allied works at WSS Chakrabhati stage-0.