Loading…
Loading…
19,197 results • Latest
Repairing of Pump no. 1 and 2 of Phase-I, Zone-II (H/L) and Other electrical works at Ramprasadpur Head Works Site under Andal Water Supply Scheme.
Providing logistic support of temporary water supply at different locations under jurisdiction of Baruipur Sub Division of South 24 Parganas District for visit of VIP as per ASL meeting requirements under South 24 Parganas W/S Division-I, PHE Dte.
Annual Rate Contract for Work of Repair of Pipeline, Tubewells, Pumpset and Pump House in various RWSS Under PHED Sub Division Shrimadhopur, Division Neem Ka Thana
Day to day Operation, Maintenance of Existing Zone-38 Bodra (SM/15757), Naora (SM/12017), Erenda (SM/12043), Shaksahar (SM/11275), Jhungri (SM/11273) Piped Water Supply Scheme under Bhangar-I Block of South 24 Parganas W/S Division-I, PHE Dte.
Supply and delivery of SFUs, MCCBs, Busbars etc for modification of electrical system at Surjanagar Head Works Site under A.S.T.A. water supply scheme.
Day to day Operation, Maintenance of Existing Zone-39 Chandpur (SM/14419), Bhangar Raghunathpur (SM/18579), Debipur (SM/18499), Gobindapur (SM/18572), Jahulgacchi (SM/15754), Serpur (SM/18500) Piped Water Supply Scheme under Bhangar-I Block of South
Annual Rate Contract for Work of Repair of Pipeline, Tubewells, Pumpset in various JJY Scheme Under PHED Sub Division Shrimadhopur, Division Neem Ka Thana
Maintenance of Garden at Head Work site of Tank- 2 at Action Area-I under New town Kolkata Water Supply Division-I PHE Dte. period of 01.07.2026 to 31.03.2027 (09Months)
Day to day Operation, Maintenance of BIJOYRAMPUR (SM/11496), JALILPUR (SM/11988), BHARU RAMKRISHNAPUR (SM/11497) and RASHKHALI (SM/18331) Piped Water Supply Schemes including Existimg Zone- 20 under Bishnupur-I Block of South 24 Parganas W/S
Withdrawing and lowering of Submersible pump motor set at river Ajoy at Bhaburia Head Works and some other allied works under Gourbazar-Ichapur and Jamgara-Jagannathpur Water Supply Scheme.
Providing logistic support of temporary water supply for different locations under South 24 Parganas district as per ASL meeting requirements under South 24 Parganas W/S Division - I P H E dte.
Maintenance of Garden at Head Work site of Tank- 1 at Action Area-I under New town Kolkata Water Supply Division-I PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09Months)
Providing Bio Toilets for for different locations under South 24 Parganas district as per ASL meeting requirements under South 24 Parganas W/S Division - I PHE Dte.
Hire charges, fitting and fixing of 1 no. 1000 ltr. capacity PVC water tank over Mechanised Van for supply of drinking water to overcome the drought like situation for Jogeshganj GP, Hingalganj block under Hasnabad Sub-Division, PHE Dte. (Phase-I)
Special interim Damage Repair / Restoration / Troubleshooting of total Distribution system and Rising Pipelines (CI/DI/HDPE) for Augmented/ New Piped Water Supply Scheme declared as HAR GHAR JAL within Bhangar-I Block under South 24-Pgns. W/S Divn.
Day to day Operation, Maintenance of Kalikapur (SM/12207), Chakberia (SM/13771), Natagachhi (SM/13499), Sahebpur (SM/13675), Beniabow (SM/13774), Raypur (SM/13773), Jagadishpur (SM/18497), Gangajoara (SM/15773), Chandpur(SM/18328) including Exist
Day to day Operation, Maintenance of Gobindapur (SM/15862), Baruli (SM/12212), Baragachhia (SM/12211) Including Existing KMDA Zone-III Piped Water Supply Scheme under Sonarpur Block under South 24 Parganas W/S Division-I, PHE Dte.
Rectification of 40 HP centrifugal pumps starter no-02, flow meter, level indicator, 80 KVA voltage stabilizer etc at Churulia High lift Pump House under Madantore water Supply Scheme.
Day to day Operation and Maintenance of Zone-6, Piped Water Supply Scheme under Sonarpur Block under South 24 Parganas W/S Division-I , PHE Dte.
Day to day Operation, Maintenance of Dhanberia (SM/13776), Indrapala (SM/11647), Kundarali (SM/11788), Chandanpukur (SM/12208), Bagdaha (SM/11280),Banbera (SM/13776),Dadpur Digirpar (SM/12057), Kathalberia (SM/12057), Ratanpur (SM/12057), Tekka
Day to day operation, maintenance of total Distribution system, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of scheme with repairing of valve chambers, and overhead reservoir for Zone-45, 48 under Mograha
Hire charges, fitting and fixing of 1 no. 1000 ltr. capacity PVC water tank over Mechanised Van for supply of drinking water to overcome the drought like situation for Dulduli GP, Hingalganj block under Hasnabad Sub-Divi, PHED (Site-Bhanderkhali)
Carriage of bleaching powder from store to various sites for disinfection
Increasing depth of 100 mm existing DI Pipe line after dismantling
Unbranded Sluice Valve of nominal size 100 mm
Increasing depth of 150 mm existing DI Pipe line after dismantling
Day to day Operation and Maintenance of Buita Sub-District Water Testing Laboratory under Buita Water Supply Scheme and its adjacent store under South 24-Pgns W/S Division-I, P.H.E. Dte. (For one year)
Yearly day to day Repairing and Maintenance of 1422 mm,1219 mm,500 mm,450 mm and 400mm M.S/D.I Primary Grid Rising Main from Usthi more to Mandirbazar, Mograhat-I GLR, DH-I GLR in the jurisdiction of DH-I Mograhat-I block under Mega Surface Water
Repairing of Bathroom with allied works for Dakshin Raipur State Referral Laboratory under South 24 Parganas W/S Division-I, PHE Dte.
Day to day operation and maintenance of total Distribution system and rising main, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of scheme with repairing of valve chambers, operation cum guarding of overhead
Supply Delivery of Chemicals reagents and consumables
Maintenance, Repairs and execution of other emergent works of Dooru Verinag Section PHE Sub Division Dooru (Phase 2nd)
DNIT for Providing and Fixing of 15 HP Motor, Panel Board and Cable and in Village Gangoli Teh and Distt. Nuh all other works contingent thereto
Arrangement of temporary drinking water through Departmental / hired vehicles to combat drought like situation at various locations within Budge Budge-I and adjoining Blocks in phase-I for the year 2026-2027 in the District of South 24-Parganas
Engagement of Valve Operator cum cycle messengers with O and Mtc. of LDS, including OHR, Pump houses, FHTC and Rising main etc. in Head works site within Zone-IV, IX of Falta Block under Mega Surface W/S Scheme of Falta-Mathurapur. (For one year)
Operation and Maintenance of 1000 mm Dia. to 450 mm Dia. M.S and D.I Rising Main from Boro Pole of MANDIRBAZAR block to MATHURAPUR-I GLR, MATHURAPUR-II GLR, JOYNAGAR-II GLR and KULTALI GLR under Mega Surface Water Based Water Supply Scheme
Maintenance, Repairs and execution of other emergent works of Kapran Right Section PHE Sub Division Dooru (Phase 2nd)
Engagement of Valve Operator cum cycle messengers with O and Mtc. of LDS, including OHR, Pump houses, FHTC and Rising main etc. in Head works site within Zone-IIIA, IIIB of Falta Block under Mega Surface W/S Scheme of Falta-Mathurapur. (For one year)
Yearly day to day repairing an maintenance of various diameter rising main (1422 mm to 150 mm) generated from Julpia Bridge to BS-I, Baruipur Municipality (Rural area), Baruipur KMD rural area CWR, Baruipur KMD rural area OHR-I, II, III, R24
Maintenance, Repairs and execution of other emergent works of Manzmooh Section PHE Sub Division Dooru (Phase 2nd)
Periodical sludge cleaning of 500 cum C.W.R. washing with fresh water, disinfection with bleaching powder at Baruipur KMDA rural area (Purandarpur) under Surface Water Based Water Supply Scheme for Arsenic affected areas of South 24-Prgs. Dist.
Maintenance, Repairs and execution of other emergent works of Kapran Left Section PHE Sub Division Dooru (Phase 2nd)
Periodical sludge cleaning of 1500 cum C.W.R. washing with fresh water, disinfection with bleaching powder at Booster Station-II (Krishnamohan) under Surface Water Based Water Supply Scheme for Arsenic affected areas of South 24-Prgs.
Periodical sludge cleaning of 1500 cum C.W.R. washing with fresh water, disinfection with bleaching powder at Booster Station-I (Begampur) under Surface Water Based Water Supply Scheme for Arsenic affected areas of South 24-Prgs. Dist.
Providing of water connection at Tourist Resort Ningli under 5452-TSM Capex 2026-27 and 2027-28
Maintenance, Repairs and execution of other emergent works of Qazigund Section PHE Sub Division Qazigund (Phase 2nd)
Operation and Maintenance of total Distribution system, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of scheme with repairing of valve chambers at Nandrampur and Uttar Roypur W/S Scheme
Damla, Providing T/Well Against Abandoned T/Well (Harijan Mari), Block Jagadhri, Constituency Radaur, District Yamuna Nagar.
Yearly day to day repairing and maintenance of various diameter rising main (1422 mm to 150 mm) generated from Diamond Harbour Road to Julpia Bridge under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. Distric
Maintenance, Repairs and execution of other emergent works of Y.K Pora Section PHE Sub Division Qazigund (Phase 2nd) )