Loading…
Loading…
19,197 results • Latest
Day to day Operation and maintenance of various diameter Secondary Grid Pipeline (600 mm to 150 mm) generated from Mandirbazar GLR to different Zones OHR in Mandirbazar Block under Mega Surface Water Based Water Supply Scheme of Falta-Mathurapur
Operation and Maintenance of total Distribution system, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of scheme with repairing of valve chambers at Jamalpur and Moukhali W/S Scheme ...
Maintenance, Repairs and execution of other emergent works of Kund Section PHE Sub Division Qazigund (Phase 2nd)
Special interim Damage Repair / Restoration / Troubleshooting of total Distribution system and Rising Pipelines (CI/DI/HDPE) for Augmented/ New Piped Water Supply Scheme declared as HAR GHAR JAL within Bhangar-I Block under South 24-Pgns. W/S Divn.
Operation and Maintenance of total Distribution system, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of scheme with repairing of valve chambers at Buita and Nischintapur W/S Scheme ..
Operation, maintenance of total Distribution system, Pipelines (CI/DI/AC/UPVC) inclusive of any augmentation / rejuvenation / Special repair of scheme with repairing of valve chambers, and overhead reservoir for Zone- Joka- I, II, Bulk
Maintenance, Repairs and execution of other emergent works of Pahloo Section PHE Sub Division Qazigund (Phase 2nd)
Day to day operation and maintenance regarding sweeping, cleaning, washing of linens, plumbing and sanitary works of Urmimukhar, Urmimala, Taranga and Generator Building at Gangasagar, Block - Sagar under Kakdwip Sub-Divn., PHE Dte. (for 365 days)
Withdrawing, Lowering of Submersible Pumping Machineries, rectification of cable fault for RBTW No-1, 13 and 14 and yard lighting arrangement at Baidyanathpur Head Works Site under Ukhra Water Supply Scheme.
Repairing and maintenance of 01 no. Pressure Filter near Tank No. 3 at Sagar Mela Ground and engagement of Ex Serviceman Security Guard (Supervisor / Armed / Un Armed) and Security Guard (Civil) at 2 nos. Block i.e. Kakdwip and Pathar Pratima
Maintenance, Repairs and execution of other emergent works of Devsar Section PHE Sub Division Qazigund (Phase 2nd)
Repairing and maintenance of 01 no. Pressure Filter near Tank No. 1 at Sagar Mela Ground and engagement of Ex Serviceman Security Guard (Supervisor / Armed / Un Armed) and Security Guard (Civil) at 2 nos. Block i.e. Namkhana and Sagar Block
Maintenance, Repairs and execution of other emergent works of Panzath Section PHE Sub Division Qazigund (Phase 2nd)
assured raw water arrangement for existing water works Bosti and proposed water works Bhatoo,construction of independent canal based water works at Village Bhatoo
Providing and installation of Submersible Pump-Motor Set in newly CWR at Gourandi Boosting station under Panuria-Itapara Water Supply Scheme.
Day to day Operation and Maintenance of 31.6 (23.6 MLD for phase-I and 8 MLD for phase-II) MLD capacity Bally Jagacha Water Treatment Plant along with Raw Water and Clear Water Rising Main of Surface Water Based Water Supply Scheme of Bally-Jagacha
Day to day Operation, Maintenance of Hasanpur (SM/15759), Malipukuria (SM/13515), Gopalpur (SM/15775), Bidyadharpur (SM/18571), Bhabanipur (SM/13308) including Existing Zone-31 Piped Water Supply Scheme under Sonarpur Block under South 24 Pargana
Laying of Distribution Pipe Line and Making of Sluice Valve Hodi at Village Konsiwas
Operation Maintenance of Distribution System , Rising main, Sluice Valves, including operation of sluice valves of Rayan(Part-A) PWSS of Burdwan-I within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year
OPERATION AND GUARDING OF PUMPING MACHINERY AT DIFFERENT WATER SUPPLY SCHEME UNDER MLMD, PHE DTE.
OPERATION AND GUARDING OF PUMPING MACHINERY AT DIFFERENT WATER SUPPLY SCHEME UNDER MLMD, PHE DTE.
Maintenance, Repairs and execution of other emergent works of Larkipora Section PHE Sub Division Dooru (Phase 2nd)
ANNUAL MAINTENANCE ESTIMATE FOR WATER SUPPLY SCHEME REWARI TOWN FOR THE YEAR 2026-2027 (SECTION 1 AND 2)
Operation mtc.at entire distribution system from WTP (Murguma) site to hosendih pump house campus at except Zone-I area Chatambari distribution of Jhalda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31
Steel Tubes, Tubulars ISI marked to IS 1239 (part-1)V2 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Maintenance, Repairs and execution of other emergent works of Hakura Badasgam Section PHE Sub Division Dooru (Phase 2nd)
DNIT for Repairing of Motor Pump, Cartage of MPump, Submersible cable 6 sqmm etc. at various village Likhi, Banchari, Ghasera, Darana, Kanwarka, Murtazabad, Sholaka, Machhipura etc. Distt. Palwal. under PHESD Hodal and all other works contingent th
Steel Tubes, Tubulars ISI marked to IS 1239 (part-1)V2 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Steel Tubes, Tubulars ISI marked to IS 1239 (part-1)V2 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Making masonry trench from transformer to LT PDB Panel, Supply and laying of cable from LT PDB to ATS for V.T. pump at Kalyaneswari Head Works under RCFA Part-I W/S scheme.
Daily Operation mtc. of rising main distribution system, sluice valve, Street stand post at Ajodhya W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Hire charges, fitting and fixing of 1 no. 1000 ltr. capacity PVC water tank over Mechanised Van for supply of drinking water to overcome the drought like situation for Barunhat Rameswarpur GP, Hasnabad block under Hasnabad Sub-Divi, PHED. (Phase-I
Road Crossing of Bardhaman- Kalna Road near Hatgobindapur Collage More with 150 mm dia pipeline through pushing of 600 mm.dia RCC casing pipe by hydraulic jacking method for Hatgobindapur W/S Scheme under Burdwan
Repairing of motor pump cartage of Mpump, repair of starter, supply of kitkat, starter oil, single phase preventor, etc. at Village Bhulwana, Paingaltu, Dakora, Gorota, Marroli, Jalalpur Maufi, Mitrol, Gopalgarh,Tumashra and all other works contin
Repairing of dismantling joint, replacement of actuator operated butterfly valve for pump no-5(Delivery line) and supply delivery and installation of Centrifugal Pump set in position-06 with existing motor for Chora and Chinchuriah Zone at Searsole.
Operation and Maintanance Work for the Salbari P.W.S.S at Matigara block under Siliguri Division P.H.E.Dte. for the Period of 365 Days
Providing and Installation of 7 Nos. T/Well by D T H Rig. Method (5 Nos. against abandoned T/Well and 2 Nos. new Installation) and laying of connecting pipe line and all othere works contingent there to in village Aklimpur, Hassanpur, Sakatpur, teek
Supply Delivery of Raw Materials for Kalyaneswari Bottling Plant for 200 ml capacity Pran Dhara pet bottles under Asansol Mechanical Division P.H.E Dte. (2nd Call).
Daily Operation mtc. of rising main distribution system under Sirkabad W/S Scheme under Purulia Division, PHE Dte. For the period of 01.09.2026 to 31.08.2027
Cleaning of 300 mm and 250 mm sewer pipe line at Farrukh Nagar Town
Hiring of Suction Jetting machine 2200 PSI machine i/c POL and operator for sewer cleaning at Farrukh Nagar Town
Operation Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Chandutia PWSS of Burdwan-I Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period 1(one)year
Laying of DI Pipe line
Operation of Distribution System , Rising main, Sluice Valves, including operation of sluice valves for Haldi Single Village Scheme of Burdwan-I Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
Special repair and renovation of Pump House, Boundary Wall etc. and allied at Itinda Panitor,Joypur Gopmahal, Kachua Swarupnagar, Mathurapur, Mirzanagar, Nalkora, Paikardanga, Pifa and Gobindapur WSS under Basirhat Sub-Divi under Barasat Divi, PHED
Operation of Distribution System , Rising main,Sluice Valves, including operation of sluice valves of Uchitpur Single Village Scheme of Raina-I within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
Operation of Distribution System , Rising main,Sluice Valves, including operation of sluice valves of Durgadanga Single Village Scheme of Memari-I within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
Operation of Distribution System , Rising main,Sluice Valves, including operation of sluice valves of Chak Basatpur Single Village Scheme of Raina-II within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year.
Repairing of Damage pipeline at Ramjibanpur (Near Bandu River) of Satra Water Supply Scheme under Arsha Block.
Special repair and renovation of Pump House, Boundary Wall etc. and allied pipe line at Dobila, Eojnogar, Gobindapur Dhokra, Goknasree Gobindapur, Gotra, Sankchura and Mominpur WSS of differ block under Basirhat Sub-Divi under Barasat Division,PHED