Loading…
Loading…
19,337 results • Latest
WBPHE/EE/JMD/NIeT 07_14 OF 2026-2027
WBPHE/EE/JMD/NIeT 07_13 OF 2026-2027
CONSTRUCTION OF OHSR AND PIPE LINE WORK IN VILLAGE ARWARA BLOCK RAJSAMAND DISTRICT RAJSAMAND UNDER DMFT GC 17th
WBPHE/EE/JMD/NIeT 07_12 OF 2026-2027
WBPHE/EE/JMD/NIeT 07_11 OF 2026-2027
WBPHE/EE/JMD/NIeT 07_10 OF 2026-2027
Shahpur A Mtc water supply scheme Shahpur Providing and fixing of Stabilizer for village Shahpur and all other works contingent thereto
WBPHE/EE/JMD/NIeT 07_8 OF 2026-2027
WBPHE/EE/JMD/NIeT 07_7 OF 2026-2027
WBPHE/EE/JMD/NIeT 07_6 OF 2026-2027
Placement of 2 (Two) nos. peon for full time by agency in the office of the Executive Engineer, NTK W/S. Divn.-I, P.H.E. Dte. (Period of work 01.07.2026 to 31.03.2027 i.e.9 Months)
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXIX), Hingalganj block. Capacity of the plant 3 cum/hr for the period 1 year.
WBPHE/EE/JMD/NIeT 07_5 OF 2026-2027
WBPHE/EE/JMD/NIeT 07_4 OF 2026-2027
Balance work for Jack Pushing of Railway Track Between RAGHUNATHBARI to RAJGODA Railway Station on Panskura-Tamluk Section of Kharagpur S.E. Railway Division of Purba Medinipur for Harasankar Khamarchak Water Supply Scheme of 600 mm dia MS Casing
Regular Lifting and clening of Floating/stacked Garbage at Y channel area and from Pre-Settling Pond (1 to 5) of WTP premises from 01.07.2026 to 31.03.2027 ( 09 months) of Action Area-I, New Town Kolkata Water Supply Project under P.H.E. Dte.
Opt. and Mtc. of Distbn. System and R/Main Pipeline(CI/DI/AC/UPVC) including repairing of FHTC Connection for NATUNGRAM W.S. Schemes of Burdwan-I Dev. Block within Burdwan Sub-Divn. under Burdwan Divn, PHE Dte. Period for 01 (one) year.
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXVIII), Hingalganj block. Capacity of the plant 3 cum/hr for the period 1 year.
WBPHE/EE/JMD/NIeT 07_3 OF 2026-2027
Maintenance of Administrative Building of New Town Kolkata Water Supply Division-I, P.H.E. Dte. period from 01.07.2026 to 31.03.2027 (09 months)
Balance portion connect with M.S pipe in both side of Jack pussing of railway track in between Bhogpur Railway station Narayan Pakuria rail station Zone III under Kolaghat Surface PWSS with in Kolagha Dev.Block in Purba Medinipur District unde
WBPHE/EE/JMD/NIeT 07_2 OF 2026-2027
Engagement of resources person for supervising the protocol / standard operating procedures/ technical documentation of laboratory water testing activities as per ISO/IEC 170252017 including performing statutory internal audit, refresher training
Additional pipe line at Nandai Gajan village of Zone-III surface base Water Supply Scheme under Tamluk Sub Division of Tamluk Division,PHE Dte.
WBPHE/EE/JMD/NIeT 07_1 OF 2026-2027
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXVII), Hingalganj block. Capacity of the plant 3 cum/hr for the period 1 year.
Balance Work In Connection With Construction of R.C.C. Elevated Reservoir of capacity 100 cum and staging height 20.00 mtr. with allied works under Agar its adjoining moujas Water Supply Scheme within Sahid Matangini Dev. Block including suppl
Cleaning, washing and maintening water fountain in front of admin building within WTP Campus for 09 months (01.07.2026 to 31.03.2027) under New Town Kolkata Water Supply Division-I PHE Dte.
Repair of inlet channel for water supply scheme Bhaklana
WBPHE/EE/JMD/NIeT 09_21 OF 2026-2027
Restoration of Roads, FHTC, PVC Tubewell 1 No.
Drilling of T/Well at Bhaklana
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXVI), Hingalganj block. Capacity of the plant 3 cum/hr for the period 1 year.
WBPHE/EE/JMD/NIeT 09_20 OF 2026-2027
Day to Day water quality and proper quantity monitoring of treated water , reporting and surveillance of total water supply system of AA-I, II , III in New Town Kolkata Water Supply Division-I, under P.H.E. Dte. for period 01.07.2026 to 31.03.2027
Drilling of t/well and other works Dharam Kheri
Route Survey Preparation of DPR for RAYAN PART-(IV) DURGA DANGA W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte.
WBPHE/EE/JMD/NIeT 09_19 OF 2026-2027
Day to day Survey work using Total Station Auto level instruments and other moderate instruments, machinery alongwith Surveyor and Surveyor Assistant, Tools and Plants machinery all complete for providing PHE Services at Action Area-I,II , III
WBPHE/EE/JMD/NIeT 09_18 OF 2026-2027
Unbranded Jute Brown Coir Rope, Length in the packing 25 meter
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXV), Hingalganj block. Capacity of the plant 3 cum/hr for the period 1 year.
WBPHE/EE/JMD/NIeT 09_17 OF 2026-2027
WBPHE/EE/JMD/NIeT 09_13 OF 2026-2027
WBPHE/EE/JMD/NIeT 09_12 OF 2026-2027
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the (a) O.H.R. site including D.P.S. of AA- IIC (Tank No. 13) (Stack Yard 4), (b) IIC STP and (c) O.H.R. site at AA-IIB (Tank No. 14 )
WBPHE/EE/JMD/NIeT 09_10 OF 2026-2027
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXIV), Hingalganj block. Capacity of the plant 3 cum/hr for the period 1 year.
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the (a)O.H.R. site at AA-IID (Tank No. 11), (b) O.H.R. site including S.L.S./ D.P.S. of AA- IID (Tank No.12), under New Town Kolkata Wa
WBPHE/EE/JMD/NIeT 09_9 OF 2026-2027