Loading…
Loading…
19,455 results • Latest
Supply, Installation, Testing and Commissioning of 200 Ampere Changeover Switch as a replacement of damaged one at Water Supply Scheme Chuntwaliwar 1st
PLEASE REFER TO BOQ
Operation and maintenance
Work related to labour supply for operation of various Rural water supply scheme in Tehsil Ghasa under Distt Rural Dn oneUdaipur
Construction and installation of MANIFOLD and allied works at OHR site under Birnagar Ground Water Based Water Supply Scheme under Ranaghat-I Block under Nadia Arsenic Division-I, PHE Dte.
Sinking of Tube Well in place of defunct tube well of Saguna Piped Water Supply Scheme under Nadia Arsenic Division-I, PHE Dte.
Work related to labour supply for operation of various Rural water supply scheme in Tehsil Mavli under Distt Rural Dn oneUdaipur
Augmentation of Distribution pipeline at Rajapur Kesaipur village under Goalsalua ZoneII water supply scheme at RanaghatII Block by providing FHTCs dedicated pipeline from common manifold under NADI PHED as a part of JJM
Work related to labour supply for operation of various Urban water supply scheme in Block Mavli under Distt Rural Dn oneUdaipur
WORK RELATED TO REPAIR- REWINDING and ROUTINE MAINTENANCE OF VARIOUS PUMP MACHINARIES AND CONTROL SYSTEM AS PER SCOPE OF WORK UNDER RURAL and Urban AREA OF BLOCK-Bhinder
Revised and Balance work of Survey, Investigation and Necessary Construction works required for Execution of Under Jal Jeevan Mission of Isharwara and Parashari Kala of Block Rahatgarh Distt. Sagar
Revised and Balance work of Survey, Investigation and Necessary Construction works required for Execution of work Under Jal Jeevan Mission of Jalandhar, Basia Bansa, Bhainsa and Binayaki of Block Rahatgarh Distt. Sagar
Revised and Balance work of Survey, Investigation and Necessary Construction works required for Execution of work Under Jal Jeevan Mission of Baheria Sahni, Mehar, Hanota Parixit, Mothi and Barkheda Khuman of Block Rahatgarh Distt. Sagar
BUWANA LAKHU PROVIDING AND INSTALLING 2 NO. DEEP TUBEWELL AGAINST ABANDONED TUBEWELL (QUALITY AFFECTED) AND LAYING OF CONNECTING PIPELINE AT VILLAGE BUWANA LAKHU IN DISTT. PANIPAT
Alupur Laying of Distribution Pipe Line in Balance Area and Providing Functional Household Tap Connection at Village Alupur, District- Panipat.
WBPHE/EE/JMD/NIeT 05_33 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_32 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_31 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_30 OF 2026-2027
Supplying of Ferric Alum including carriage loading, unloading and stacking properly at Godown of Dariapur Water Treatment Plant under Malda Arsenic Area Water Supply Division, P.H.E. Dte., in the district of Malda.
WBPHE/EE/JMD/NIeT 05_29 OF 2026-2027
Supplying of Ferric Alum including carriage loading, unloading and stacking properly at Godown of Mathurapur Water Treatment Plant under Malda Arsenic Area Water Supply Division, P.H.E. Dte., in the district of Malda.
WBPHE/EE/JMD/NIeT 05_28 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_27 OF 2026-2027
Operation and guarding of the electric operated auto/manual controlled pumping machinery of Nagendrapur, Kautala and Chaplarkhop W/S Scheme of Mathurapur-II Block under south 24 pgs Mechanical Division PHE Dte.
WBPHE/EE/JMD/NIeT 05_26 OF 2026-2027
Emergency construction of temporary Toilet and Tubewell for flood like situation 2026 at different GP of Kaliachak - II and Kaliachak - III Block under Malda Arsenic Area W/S Division, P.H.E. Dte. Malda.
WBPHE/EE/JMD/NIeT 05_25 OF 2026-2027
Emergency construction of temporary Tubewell for flood like situation 2026 at different GP of Manikchak Block under Malda Arsenic Area W/S Division, P.H.E. Dte. Malda. (Part - VI).
WBPHE/EE/JMD/NIeT 05_24 OF 2026-2027
Operation, and Guarding of Gaseous Chlorination system at OHR site Zone-S at Jagadalla under Bankura-I Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme under BMD,PHED
Emergency construction of temporary Toilet and Tubewell for flood like situation 2026 at different GP of Manikchak Block under Malda Arsenic Area W/S Division, P.H.E. Dte. Malda. (Part - V).
WBPHE/EE/JMD/NIeT 05_23 OF 2026-2027
WBPHE/EE/JMD/NIeT 05_22 OF 2026-2027
Operation, and Guarding of Intermediate Boosting pumping station (IBS) and sub-station equipments at Belboni under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte.
Emergency construction of temporary Toilet and Tubewell for flood like situation 2026 at different GP of Manikchak Block under Malda Arsenic Area W/S Division, P.H.E. Dte. Malda. (Part - IV).
WBPHE/EE/JMD/NIeT 05_21 OF 2026-2027
Operation and maintenance of pumping machinery and 11KV/ 0.433 KV substation at Boosting Station-II, Rana Paschim Ramnagar under A.A.A surface based water supply project in S.24pgs District under South 24pgs Mechanical Division, PHE Dte.
Emergency construction of temporary Toilet and Tubewell for flood like situation 2026 at different GP of Manikchak Block under Malda Arsenic Area W/S Division, P.H.E. Dte. Malda. (Part - III).
Guarding arrangement at Ailakundi (Unicef) Store of Bankura Mechanical Sub-Division (Drilling) under Bankura Mechanical Division, P.H.E.Dte.
Emergency construction of temporary Toilet and Tubewell for flood like situation 2026 at different GP of Manikchak Block under Malda Arsenic Area W/S Division, P.H.E. Dte. Malda. (Part - II).
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-A of Bhuakhana Block -Khatra under Khatra-Hirbandh-Ranibandh Block Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Dist- Bankura
Emergency construction of temporary Toilet and Tubewell for flood like situation 2026 at different GP of Manikchak Block under Malda Arsenic Area W/S Division, P.H.E. Dte. Malda. (Part - I).
Operation and maintenance of pumping machinery and 11KV/ 0.433 KV substation at Boosting Station-I Begampur under arsenic affected area surface based water supply project in S.24pgs District under South 24pgs Mechanical Division., PHE Dte.
Operation, and Guarding of pumping machineries and other accessories at CWR site of Ajodhya and Adjoining Mouzas Sub-Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block Bishnupur Dist- Bankura
Maintenance of chlorinator Hydraulic Diaphragm type or other for different rural piped water supply schemes in Mathurapur- II Block under South 24 Pgs Mechanical Division, P.H.E.
WBPHE/EE/JMD/NIeT 05_20 OF 2026-2027
Operation and Guarding of pumping machineries and other accessoris installation at T/W No- I to IV of Chakuparsole (Zone-A) and adj. mouzas ground water based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block-Bishnupur
WBPHE/EE/JMD/NIeT 05_19 OF 2026-2027
accessoris installation at T/W No- I to III of Chuamasina (Zone-B) and adj. mouzas ground water based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block Bishnupur Dist- Bankura