Loading…
Loading…
9,435 results • Latest
Est. No. CR / SESD / 6816 / 2026-27 Providing Semi comprehensive AMC for Fire Fighting System installed at Rural hospital Dodamarg, Malvan, Katta, Kudal, Devgad , Vaibhavwadi , Vengurla and Sub district hospital Shiroda, Dist-Sindhudurg.
SH Civil work water supply and sanitary installation Electrical Installation and providing and laying 80mm thick Paver Block RD 0 0 to 0 220
Restoration of rain damages on link road Jole to Kainth via Bhooran Amroh Kuhroo Sanjot road Km 000 to 14255 SH PL 30mm thick bituminous concrete between RD 4740 to 4965 5200 to 5300 and 6000 to 6100 under PDNA 2025
Sanitary repair work in Qtr No IV-76 Under Sub Dn Gandhi Nagar I, Jaipur (Sanction work)
Carrying out High-Resolution Airborne LiDAR Survey and Topographic Mapping for the Proposed Expansion of the Gaggal Airport District Kangra (H.P)
Providing and laying Bituminous Macadam for profile correction at Various Reaches from km 12/00 to 22/070, including protection works at various Reaches
Provision of Internal and External Electrical arrangements to the 5 class rooms and 1 unit Boys Toilet in Government High School under NABARD RIDF XXXI at Nandhimangalam in Hosur Taluk of Krishnagiri District.
Work of Phase-II (Stage-II) of the Naraya Fedulani Motor Road in Kalsi Block of Chakrata Constituency, District Dehradun, under the State sector.
SH Renovation of temple langar hall and courtyard and construction of water supply and sanitary installation Septic tank and Rain water Harvesting tank
Construction of box culvert, approach road, and additional approach road at Hadahi drain in District Jaunpur.
Construction of box culvert, approach road, and additional approach road at the drain in the middle of Gram Sabha Porai, District Jaunpur.
Construction of box culvert, approach road, and additional approach road at Besav river in Bhdauti, District Jaunpur.
Construction of minor bridge, approach road, and additional approach road at the drain in Gram Sabha Songar, District Jaunpur.
Construction of box culvert, approach road, and additional approach road at the drain near Gram Sabha Lapri Prasad s Purva, District Jaunpur.
Renovation work from Nahargarh to Biloda via Pachalavada Km 0/0 to 12/400 in District Baran.
Construction work of canal side road from Keshopura to Sanmanpura Kakad in district Kota.
Jamaldah Ranirhat Road via Uchalpukuri from Ch. 6.00 kmp to ch. 8.00 kmp (in stretches) patching and repairing potholes work under Coochbehar Highway Division in the district of Coochbehar.
Construction of a minor bridge at km 12 on Parsa Varachawar Tirahipur road (ODR), replacing the damaged skew culvert In District Ghazipur.
Construction of a 2x4x4 meter box culvert and approach road at km 1 on Parsa Varachawar Tirahipur road leading from Dr. Ram Manohar Lohia Degree College, replacing the narrow culvert In District Ghazipur.
Construction of a minor bridge at kilometer 11 (Jhotari) on Alawalpur Baresar Tirahipur road (ODR) in District Ghazipur, replacing the damaged skew culvert
Construction of a minor bridge at km 9 (Baresar) on Alawalpur Baresar Tirahipur road (ODR), replacing the damaged skew culvert In District Ghazipur.
Construction of a 3x4x4 meter box culvert and approach road on the connecting route between Gobindpur and Nihalpur in District Ghazipur
Reconstruction of a small bridge with a 9 meter span, located at the Makhaina escape on the Mau-Fatehpur link road at km-1in District Bulandshahr
GENERAL-Procurement of PA system for 8B court and supply of additional microphones at High court of Kerala-Supply of additional microphones to High court of kerala-General Electronics Work
Construction of a 2x3x3 meter box culvert and approach road on Rajoli Kalani link road at Sekhwa drainIn District Ghazipur.
Chandrakona Goaltore-Sarenga Simlighat Road between 29.00 kmp. to 40.00 kmp. in stretches Cleaning of road flank, cutting kutcha drain over the flank to drain out rain water, cleaning Bridges and Culvert etc. in connection with the monsoon prepare
New Construction of Ganga Ghat connecting road from G.T. Road via Saraiya Ghat Road and Allapur Baseni. (Including 05 Years maintenance cost)
New Construction of Gauri Bhagwantpur to Kashinath ka Purwa road. (Including 05 Years maintenance cost)
New Construction of road in Village Chakratanpur, starting from the ALIMCO Chakratanpur road and passing via the houses of Smt. Renu Rai and Shri Balaji Traders up to Shri Akhilesh Dubeys house in Village Nankari. (Including 05 Years maintenance cos
New Construction of connecting road from Fatehpur Chaurasi Kali Mitti Bridge via Panki Gangaghat, to Bithoor-Saibsu-Mainawati Road. (Including 05 Years maintenance cost)
Construction of a 5x5 3 cell box culvert at km 2 of the Ramkola Link road in Gorakhpur district under the State Plan for the financial year 2026-27 Lot No 1 of 1
Reconstruction of a small bridge with a 18 meter span, situated on the Anupshahr Branch Canal at km-2 of the Roopvas link road in District Bulandshahr
Simlapal Sarenga Bamundiaghat Road between 9.00 kmp. to 18.00 kmp. in stretche, ch.22.00 kmp. to 24.00 kmp. in stretches and 26.00 kmp.to 28.00 kmp.in stretches Cleaning of road flank, cutting kutcha drain over the flank to drain out rain w
New Construction of road from New Shivli Road, via Mishra Hardware, to the new Ratanpur Chhath Puja Bridge. (Including 05 Years maintenance cost)
Development of GDC Tulail link Road B.W.O GSB filling,WBM G-II and C/O Causeway at Sheikhpora Tulail
R.R Damages on link road to Village Tranda 0.00 to 5/555 SH. P.L Cement Concrete Pavement at RD 2.700 to 3.000.
Strengthening work on the Jahangirabad Feeder Bypass Road (ODR) in District Bulandshahr at km 2(280), 3, and 4(800)
Taldangra Panchmura -Chowbeta Road from ch. 26.10 km. to 26.60 km in stretches repairing andmaintenance work under Bankura Highway Division in the district of Bankura
New Construction of the missing link road between Mainawati Marg and Sadikamau. (Including 05 Years maintenance cost)
Periodical Maintenance of Urni to Miroo Rangle Village road under Annual Maintenance Plan for the year 2026.27. SH. Providing and Laying 30mm. thick Bituminous Concrete at Km. 3.00 to 3.900
New Construction of road from Tuti Puliya old Shivli Road to the IIT Society Gate, and from the Bara Sirohi substation transformer via Ajay Enterprises to Durga Hospital on the new Shivli Road. (Including 05 Years maintenance cost)
New Construction of connecting road linking Mirzapur village and Gadariyanpurwa via Ratanpur Colony. (Including 05 Years maintenance cost)
Hiring of the vehicle of the Type Toyota Innova /Mahindra Scorpio for office use by the Executive Engineer (RandB) Division Dalgate Srinagar inclusive of all maintenance cost of vehicle / road taxes including hiring of an expert licensed Driver exclu
Reconstruction work involving the provision of a 18m RCC box culvert to replace the damaged minor arch bridge located at the Km-1 of the Daraura link road in District Bulandshahr
Sabrakone Morar Road from ch. 1.00 km. to 5.00 km in stretches, repairing and maintenance work under Bankura Highway Division in the district of Bankura.
C.O Balance work of Bus stand at Rakchham, District Kinnaur, H.P.SH.P.F Flooring P.L Wooden Shutters P.A Painting and W.S. S.I. etc
Construction work of Lalpur to Saraiya Primary School Link Road (Including 5 year maintenance cost) under Vidhan Sabha Akbarpur Raniya