Loading…
Loading…
1,00,172 results • Latest
Providing Renovation/ Repairs with Electrical Installation and Shifting of Air conditioner units at SRA Brihanmumbai Administrative Building, Bandra (East), Mumbai.
Construction of Retaining wall at RDs 10/555 to 10/570 and 10/600 to 10/615)
REPAIR OF DAMAGED CD WORK AND RETAINING WALLS ON VARIOUS ROADS UNDER SUB. DN. GIRWA I
Providing Fully Comprehensive Service contract of 5 passenger VVVF Micro Automatic Power operated doors lift No.5 and 6 travelling Grd 6 floors 7 stops or 7 openings at Main Hospital Building at Sir J.J.Group of Hospital, Byculla, Mumbai
Provision of Internal and External Electrification arrangements to Ware House for proper storage of EVMs VVPAT s at Chengalpattu in Chengalpattu District
Construction of Toilet Block in Government Tribal Ashram School Campus at Somatwadi, Taluka- Junnar, District- Pune
Construction of 2 Classrooms at Govt HPS Hadanoor in Shorapur Taluka District Yadgir (Under 4202-01-201-1-04-(139) (Education) for the Year 2025-26)(DICE CODE 29330807102)(Reserved for 2A Category)
Constuction of 900 mm Hume Pipe Culvert at RD 3/470)
Internal finishing work of Hocky Stadium at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2024-2025.
REPAIR OF DAMAGED RETAINING WALLS AND CC ON VARIOUS ROADS UNDER SUB DN. GIRWA II
H11232 of 2024-25Providing Standby type VRF type AC system for Medical Store at Ground floor of Main Hospital Bldg., Sir J. J. Group of Hospitals compound, Byculla, Mumbai.
Development of road of the Vaisam Village appropach road, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
COSMOS Industrial Grade Puf Seal, Size 750 milliliter
Providing Renovation / Rrepairs of Electrical Installation Work and Accessories at SRA Brihanmumbai (Wing A, B and C) Administrative Building, Bandra (East), Mumbai.
GENERAL RM 2026 27 RC 2 One year RC Ernakulam Kalamassery Zone 3 Kunnukara Panchayath One year Running contract for various PWD Roads under road section Kalamasserry in Ernakulam district 7 road stretches for a length of 12 25km General Civil Work
Renewal of Air Conditioner and Lighting arrangements to the 10th Floor meeting hall to the Ex-MLA Hostel and Renewal by Supply and Fixing of 90 Nos. 2TR Hl wall mounting split type AC units in MLA Hostel at Omandurar Government Estate, Chennai-2.
Renovation of DM Office Kanjhawala, Sub Divisional Magistrate office (Nangloi, Kirari) and Sub-registrar Office, Nangloi including SITC of LED Luminaires, PC System, Fans, STAC Under North West District, Kanjhawala Delhi)
ANS Metal keyboard tray made of Alloy Powder Coating
Unbranded Stainless steel shim(NHPC), Warranty 12 month
Construction of Building portion including Internal Water Supply, Sanitary Installation, Sewage and Drainage Works and other allied works
REFER TO BOQ
Construction of retaining wall at RD 0/600 to 0/610 and Construction of cement concrete pavement at RD 0/600 to 0/610
Providing RCC Gutter near Tricharan Nagar B n C in Ward No.39 in Prabhag Samiti B in VVCMC area.
REFER TO BOQ
Car parking near Training Ground 1 and 2 at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2024-2025.
Consultancy for Construction of 03 ACRs. Examination Hall. Toilet Complex for Boys and Girls Staff at Govt. Model HSS Marh
Maintenance Work
Annual Maintenance of Electrical and allied installation with provision of materials and manpower at Barasat Govt. College, Barasat, North 24 Pgs.-- AMC of E.I. work for the period of 01 (One) year.
Supply and fixing of LED lights on existing RCC poles at different locations under Booth No. 47 of Debanandapur GP under Amader Para Amader Samadhan Scheme.
Construction of Approach road to Kashmir Campus University of Jammu at Rakh Arth Bemina (Balance Part)
Ordinary Repair work of Residential Buildings under PWD Sub Division Sonkatch
Providing 250 KVA DG set with accessories in the office of Chief Electoral Officer Punjab SCO No 29 to 32 Sec 17E Chandigarh
Construction of RCC box culvert (5.00 x 5.00) mtr single cell Structure near Kathalia HS School on road from Kathalia to Ramcherra under Kathalia RD Block within the jurisdiction of Kathalia Sub Division PWD(RandB) during the year 2026 27
Repair work of old floor tiles, septic tank and painting and repairing work and RCC water tank Cow catcher and other work of Govt College Kannod
Development of road from approach road of Kanchanpur Pig Firm, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Dismantling of various items and retrofitting of various structural elements using shortsheeting, reinforcement jacketing, injecting epoxy resin in cracks and other various items) Deposit work
Operation and Maintenance of 2 Nos. 500 LPH RO Plants for Govt. Sarvodaya Co-Ed. Sr. Sec. H Block, Karampura, New Delhi 110015 (School ID 1516104).
Separate entry gate and internal pavement work near Training Ground 1 and 2 at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2024-2025.
Ordinary Repair work of Residential Buildings under PWD Sub Division Kannod
Supply and fixing of LED lights on existing RCC poles at different locations under Booth No. 45 of Debanandapur GP under Amader Para Amader Samadhan Scheme
SH Major civil repair, improvement and allied works at Karkardooma Court Complex, Shahdara, Delhi.
Preparation of DPR of Roads under Kannod and Sonkatch Sub Division
Construction of service road from village Khaur to village Lohi on NH 39 in Rewa Gaddi Marg, length 4.62 km. Under Sub-Division No. 1 Rewa
BOQ
Construction of Boundary Wall of Biswanath District Jail at Biswanath Chariali (B)
BPE Line Interactive UPS with AVR of Rating 0.65 KVA With Warranty of 2 Years
Annual maintenance contract for repair and routine maintenance of electrical installation in Blessington Hostel girls under IGMC Shimla for the year 2026 to 27
acer AMD Ryzen 5 PRO 8500GE All in One PC
Unbranded Box of 1000 Staple Pins of size 23/17
Govt. Residencial and Non Residencial Building Maintenance Work under P.W.D. Sub Division Budni No. 01