Loading…
Loading…
1,532 results • Latest
Advance Deposit Work Under Subdivision-Lalganj and Devgaw, EDD- Lalganj Azamgarh
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
I/C OF 33/11KV S/S MACHHALISHAHAR (TAHASIL), CONSTRUCTION OF ADDITIONAL 5MVA T/F FOR 33/11KV S/S IMRANGANJ GADABADI AND 11KV LINE FROM 33/11 KV S/S GODABADI, DIST.- JAUNPUR ON SEMI TURNKEY BASIS.
CONSTRUCTION OF ADD. 5MVA FOR 33/11KV S/S AND 11KV LINE FROM 33/11 KV S/S MIRZAPUR AND SAITAPATTI, DIST. GHAZIPUR ON SEMI TURNKEY BASIS.
For the work of installation of a 05 MVA TF Vishunpura SS and The Construction of 11 KV Feeder Line Vishunpura SS ditt Kushinagar
FOR THE WORK OF INSTALLATION OF NEW DT 100 KV AT GOKULDHAM, CAPACITY ENHANCEMENT OF 25KVA TO 63KVA AT JHARWA UNDER EUDD I- TOWNHALL AND REARRANGEMENT OF LT/HT LINE NEAR JHARKHANDI MAHADEV MANDIR UNDER EUDD III MOHADDIPUR, GORAKHPUR.
For Attending 33/11 KV and LT, underground Cable/Outdoor/Indoor in area of UEDD-Chetmani, Varanasi
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
CONSTRUCTION OF ADD. 5MVA FOR 33/11KV SUBSTATION BILARIDEEH AND I/C OF 33/11KV S/S JALALPUR KANTA, DISTT. CHANDAULI ON SEMI TURNKEY BASIS.
CONSTRUCTION OF ADDITIONAL 5 MVA FOR 33/11 KV SUB-STATION BAGAHI AND CHANDAULI, DISTT. CHANDAULI ON SEMI TURNKEY BASIS.
FOR THE WORK Details of Ongoing Works to be undertaken for the Repair and Reconstruction of lines damaged by potential natural Calamities Heavy Rainfall or Strong Winds under EDD Sahjanwa Gorakhpur
Increasing Capacity of 33 11 Ss Kaptanganj Basti From 5 PLUS 10 MVA to 2x5 PLUS 10 MVA
Increasing Capacity of 33 11 Ss Itwa Grameen Siddarthnagar From 5 PLUS 10 MVA to 2x5 PLUS 10 MVA
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Refer to Tender Description
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Refer to Tender Description
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
CIVIL RECTIFICATION AND STRENGTHENING WORK OF CONTROL ROOM BUILDING, E.E. EDD OFFICE, SDO EDSD OFFICE AND LEVEL RAISING OF EXISTING ROAD AT 33/11 K.V. S/S PHOOLPUR, DISTT- AZAMGARH.
CIVIL RECTIFICATION AND STRENGTHENING WORK OF CONTROL ROOM BUILDING AT 33/11 K.V. S/S RAUNAPAR AND CONSTRUCTION OF BOUNDARYWALL AT 33/11 K.V. S/S RANI KI SARAY DISTTAZAMGARH.
Construction of boundary wall at 33/11 kv Substation-Kaudihar, District-Prayagraj.
Civil rectification and strengthening work of control room building at 33/11 KV Substation-Lediyari Prayagraj
Construction of Boundary Wall At 33/11 Kv S/S- Jamaalpur, District-Mirzapur.
Rectification and strengthening of office building and construction of ladies toilet at EDC-I office and EE EDD Yamunapar Georgetown, District- Prayagraj
Civil rectification and strengthening work of control room building at 33/11 KV Substation-Holagarh and Newadiya, District-Prayagraj.
Work involving the shifting of the 33 KV HT line between Sahupuri Road and Padav Crossing and work of shifting the 11 KV H.T. line near Vill.-Chittampur within the jurisdiction of the EDD-II, Mughalsarai, under the Deposit Scheme.
The shifting of 11 kV LT lines poles and distribution T F which obstruct the road-widening and strengthening the road from NH-135 Dagmagpur to the Indian Oil Terminal Hinauti into a four-lane highway under the EDD Chunar Mirzapur
Work regarding the construction of an 11 kV dedicated feeder line for the CWR-5 Galra and CWR-7 Barua connection in Haliya Block under the Uttar Pradesh Jal Nigam Mirzapur by the EDD-Kachhwa Mirzapur 2026-27
Supply of De-Centralized materials Semi Turnkey and Construction of 11 KV LT line and Installation of transformers HT metering system for given supply Nivesh Mitra Jhatpat portal Sansad Vidhayak Nidhi under deposit scheme in EDD-Kachhawa Mirzapur
Supply of DeCentralized materials and shiffting dismantling of 11 KV LT line which in the construction of Semara Chauraha to Gadbada Dham Block Halliya under deposit scheme of EDD Kachhawa Mirzapur
CIVIL RECTIFICATION AND STRENGTHENING WORK OF CONTROL ROOM BUILDING AT 33/11 K.V. S/S AZAMPUR AND MEHNAGAR DISTT-AZAMGARH.
EXTENSION OF CONTROL ROOM AT 33/11 KV SUB STATION-SEHMALPUR, DISTT-JAUNPUR.
RECTIFICATION AND STRENGTHING WORK OF CONTROL ROOM BUILDING AT 33/11 KV S/S-KABIRUDDINPUR, DISTT-JAUNPUR.
CIVIL RECTIFICATION AND STRENGTHENING WORK OF CONTROL ROOM BUILDING AT 33/11 K.V. S/S HIRANPUR AND CONSTRUCTION OF BOUNDARYWALL AT 33/11 K.V. S/S ARDAUNA, DISTT- MAU.
CONSTRUCTION OF BOUNDARYWALL AT 33/11 KV S/S-RASTIPUR, DISTT MAU.
EXTENSION OF CONTROL ROOM AT 33/11 KV SUB STATION- DHOBHI, DISTT-JAUNPUR.
Maintenance and repairing of Damaged line In EDD Bansi
EXTENSION OF CONTROL ROOM AT 33/11 KV SUB STATION- JALALPUR, DISTT-JAUNPUR.
EXTENSION OF CONTROL ROOM AT 33/11 KV SUB STATION-LUDUKA(MACHALIGAON) DISTT-JAUNPUR.
EXTENSION OF CONTROL ROOM AT 33/11 KV SUB STATION-NEWADIYA, DISTT-JAUNPUR.
EXTENSION OF CONTROL ROOM AT 33/11 KV SUB STATION-BAJRANG NAGAR, DISTT-JAUNPUR.
SPECIAL MAINTENANCE WORK OF OFFICE BUILDING OF VIGILENCE OFFICE DISTRICT BASTI
CHANGING SHEETS OF OLD DAMAGE SHED FLOOR REPAIRING CONSTRUCTION OF TOILET AND APPROACH ROAD AT TF REPAIRING WORKSHOP DISTRICT GORAKHPUR
Work involving the straightening of damaged electric poles and the tightening of loose or sagging HT and LT lines subdivision-Lalganj
Work involving the straightening of damaged electric poles and the tightening of loose or sagging HT and LT lines
Work involving the straightening of damaged electric poles and the tightening of loose or sagging HT and LT lines under Subdivision-Mahnagar
Work involving the straightening of damaged electric poles and the tightening of loose or sagging HT and LT lines Sub-Divison Muhammadpur
Work involving the straightening of damaged electric poles and the tightening of loose or sagging HT and LT lines under subdivision-Devgawan
SPECIAL MAINTENANCE WORK OF TYPE 3 HOUSE LOCATED AT 3311 KV SUBSTATION MAHSON FOR OPERATION OF NEWLY CREATED SUBDIVISION OFFICE DISTRICT BASTI