Loading…
Loading…
1,532 results • Latest
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Supply of various types of stationery and repairing work of computers, printers, cartridges, UPS under EDD Lalganj Pratapgarh
S/I OF CCTV AT ACTIVITY CENTER AND HI TECH TESTING LAB PuVVNL, DISTT-VARANASI.
X-arm Holding Clamp for PCC Pole 8.5 meter, Top Channel/Dropper Channel/Holding Clamp, Gaurding Angle Clamp of PCC, LT Clamp for PCC Pole, Lt Clamp for ABC Cable, Stay Insutator, 11 KV F-Clamp for PCC Pole, Stay Clamp, Earth Wire Clamp, LT Shackle Insulator 100X115 mm, I Hook Clamp for 8.5 Meter PCC Pole, Suspension Clamp, Ded End Clamp, Ston Pad 300X300X75 mm, Nut & Bolt off Size
CONSTRUCTION OF SINGLE STOREY SWITCH GEAR ROOM BOUNDARY WALL COLLECTION ROOM AND OTHER MISC CIVIL WORK AT 3311 KV SS LAHRAIYA DISTRICT SANT KABIR NAGAR
Separate Delta earthing as per Designs enclose for LA structures of 33/11 KV Switchyard Required all men, materials and T and P providing by Contractor installed at various 33/11 Substations under Electricity Distribution Circle-II, Gorakhpur
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
CONSTRUCTION OF SWITCH GEAR ROOM, BOUNDARY WALL AND OTHER MISC. CIVIL WORK AT 33/11 K.V.S/S-GORAPATTI SADHIRANGANJ, DISTT-JAUNPUR.
CONSTRUCTION OF SWITCH GEAR ROOM, BOUNDARY WALL AND OTHER MISC. CIVIL WORK AT 33/11 K.V.S/S-SIDDHIKIPUR, DISTT-JAUNPUR.
CONSTRUCTION OF BOUNDARYWALL AT 33/11 KV S/S-AHIYAPUR, DISTT-JAUNPUR.
Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Local 24*7
ANNUAL ELECTRICAL M AND R WORK OF NEW AND OLD M.D. OFFICE, INSPECTION HOUSE, CUSTOMER CARE CENTER, C.Z.E. OFFICE, E.T.I, BADMINTON HALL AND OFFICERS/ EMPLOYEE RESIDENCES, AT VIDYUT NAGAR, BHIKHARIPUR, VARANASI.
EXTENSION OF SGR AT 33/11 KV S/S-PANDEYPUR, DISTT-VARANASI.
CIVIL RECTIFICATION AND STRENGTHING WORK OF CONTROL ROOM BUILDING AT 33/11 KV S/S-MUNGRABADSHAHPUR AND SATAHARIYA, DISTT-JAUNPUR.
Extension of SGR at 33 11 kv sub station vikramjot Distt Basti
SHIFTING OF 33KV OVERHEAD HARIHAR COLD STORAGE FEEDER DUE TO PROPOSED EXPANSION OF RUNWAY OF LAL BAHADUR SHASTRI INTERNATIONAL AIRPORT BABATPUR, DIST.-VARANASI ON SEMI TURNKEY BASIS
Extension of SGR at 33 11 KV sub station Malviya Road Basti
Extension of SGR at 33 11 KV sub station Samardhira Maharajganj
Electrical work
Electrical work
Electrification Work
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 KM Per Month; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 KM Per Month; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 KM Per Month; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 KM Per Month; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 KM Per Month; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 KM Per Month; Local 24*7
Replacement of Faulty Parts/Accessories and Upgradation of 100 Nos. Existing 1.98 MVAr (3-Step) APFC Capacitor Bank Systems to 4.356 MVAr Installed / 3.96 MVAr Effective (5-Step Heterogeneous) APFC Systems at 33/11 kV Sub-Stations
LT PVC Un. Ar. CABLE 1X70 SQ.MM
LT PVC Un. Ar. CABLE 4X16 SQ.MM
Insulated Dog Conductor
LT XLPE Un. Ar. CABLE 3.5X400 SQ.MM
LT XLPE Un. Ar. CABLE 3.5X240 SQ.MM
LT XLPE Un. Ar. CABLE 3.5X150 SQ.MM
LT XLPE Un. Ar. CABLE 3.5X70 SQ.MM
ACSR WEASEL CONDUCTOR
ACSR DOG CONDUCTOR
Strengthening of damaged 33 KV old and unused Line from Dala to Gajraj Nagar Sonbhadra
WORK OF 11 KV LINE IN BP 2026-27 UNDER EDD HANDIA PRAYAGRAJ
Development of MRI based Billing System for 5 kW and above (excluding PTW consumers) Consumers in PuVVNL, Discom
Refer to Tender Description
Works involving the installation of new poles to maintaining proper ground clearances due to long spans at various 33 11KV SS as well as other associated tasks including the guarding of lines at necessary locations Under EDD Mirzapur
Advance Deposit Work Under EDD- Lalganj Azamgarh
Advance Deposit Work Under subdivision-Nizamabad EDD- Lalganj