Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
4,390 results • Latest
Repair and Renovation work of Govt Residential and Non Residential Building (PWD Rest House, Ganghut and Store) Under Sec. Sikarganj Sub. Dn. Churhat Distt. Sidhi, PWD Building SOR w.e.f 01-01-24
Repair and Renovation work of Govt Non Residential Building (PWD Rest House, Sub Dn.Office,Ganghut and Store) Under Sec. Churhat Sub. Dn. Churhat Distt. Sidhi, PWD Building SOR w.e.f 01-01-24
Repair and Renovation work of Govt Residential Building Under, Churhat Sub. Dn. Churhat, Distt. Sidhi, PWD Building SOR w.e.f 01-01-24
Leakage/Seepage, Fencing, Profile Sheet, Vitrified Tiles, Granite Works, Paver Block Works and Drainage Works in Forensic Medicine Department, Pediatric Surgery Department and CT-MRI Radio diagnosis Department Under N.S.C.B. Medical college Jabalpur(
Leakage/Seepage, Epoxy Grouting, Plaster Repairing, Aluminum Partition, Tiles Works, Water Tank Replacement, G.I. Pipeline, Plumbing and Sanitary Fitting Works in Eye OT (Ophthalmology Department) and Old Hospital Building Under N.S.C.B. Medical coll
Strengthening of Banwari Approach Road Length 0.80 Km. Under Sub Division Gadarwara.
B.T. Patch Repair and Other Maintenance Work of Various Road Under Sub. Division Gadarwara.
Strengthing of Pondaki Karangra road Total Length 6.00 Km Praposed Length 3.00 Km
Strengthing of Khamroudh to Tankitola Chatua road Length 1.40 Km
Strengthing of Patpariyatola Approch, Payari Approch road and Length 2.20 Km
Zonal Contract for Maintanace of PWD all roads Under Sub Division Anuppur Division Anuppur (All SOR Item of Road and bridges SOR effected from 11.04.2025 and its Amendment)
Construction of Helipad with approach rod and barricading transporting work for differentLaw and Order, Security arrangement in VVIP,VIP Programme, National Programme and other work. Under Sub Division Anuppur (All SOR Item of Road and bridges SOR
Maintenance /construction work at central jai section HQ no 2 jbp
Addition/Altration of flate No. 1 and 8 in Condominium buildings at MPHC, Jabalpur and other work of professior colony under MMV section, Jabalpur.
Maitenance and varius repairing work in Res bunglow under Hq section under HQ sub dn no 3 jbp
Zonal electrical work of renovation, S/R, mow, deposit, A/R for residential building (RB) HQ, Circuit house, rest house Head Quarter Section Distt. Umariya (M.P.)
REPAIR AND MAINTENANCE OF ROAD AND CULVERT UNDER NIMAR SUB DIVISION KHANDWA
CONSTRUCTION OF HALIPAD WITH APPROACH ROAD BARRICADING TRANSPORTING AND OTHERS WORKS DURING THE VISIT V.V.I.P. PROGRAME AT OMKARESHWAR UNDER KHANDWA SUB DIVISION KHANDWA
CONSTRUCTION OF HALIPAD WITH APPROACH ROAD BARRICADING TRANSPORTING AND OTHERS WORKS DURING THE VISIT V.V.I.P. PROGRAME UNDER HARSUD SUB DIVISION KHANDWA
AR.SR.MOW. AND DEPOSIT WORK TO GOVT. RESIDENTIAL NON RESIDENTIAL BUILDING UNDER HARSUD SUB DIVISION KHANDWA
BT Renewal work on Kumbhraj Batawada to Eintkhedi Road Length 0.70 km.
BT Renewal work near FDDI Road Length 700 meter in gram panchayat haripur
Zonal Tender for M.O.W./S.R./Deposit work in RB and NRB Building with Repairing of A.C./Cooler and Fan etc. at Civil Line Rewa Distt. Rewa (M.P.)
Zonal A.R./S.R./M.O.W./Deposit Work of Internal Electrification Work in Maihar Section under PWD (E/M) Sub Division Satna (M.P.)
Zonal Tender for M.O.W./S.R./Deposit work in RB and NRB Building with Repairing of A.C./Cooler and Fan etc. at Engineering College Rewa Distt. Rewa (M.P.)
Zonal Tender for M.O.W./S.R./Deposit work in RB AND NRB Building with Repairing of A.C./Cooler and Fan etc. at Dr. Colony and Hostels Rewa Distt. Rewa (M.P.)
Item for FIRE HYDRANT WORK FOR GANDHI MEMORIAL HOSPITAL OPD BLOCK AT REWA (M.P.)
Zonal A.R./S.R./M.O.W./Deposit Work of Internal Electrification Work in Circuit House Section under PWD (E/M) Sub Division Satna (M.P.)
Item for Providing Automatic Fire Alarm and Smoke Detector System at S.S. Medical Collage Rewa Distt. Rewa (M.P.)
Item for Providing Automatic Fire Alarm and Smoke Detector System in Out Door Patient Dept. (OPD) at S.S. Medical Collage Rewa Distt. Rewa (M.P.)
B.T. Renewal work on Pooranpura Link road Gali No. 5 to Ahmadpur road length 1.80 km. IIIrd Call.
Item for Supply, Fixing, Testing AND Commissioning Automatic Fire Detection and Supression System with Novec 1230 Gas at D.G. Set Main Control 33/0.4 KV at Unit Room at S.G.M.H. Rewa (M.P.)
B.T. Renewal work on Bichhiya to Purakhana road length 1.00 km. IIIrd Call.
Supply, Fixing, Testing AND Commissioning Automatic Fire Detection and Supression System with Novec 1230 Gas at Panel of ICCU Medicine Room at S.G.M.H. Rewa (M.P.)
Special Repair work of 1.50 M Single Span Slab Culvert on Churhat Amiliya Sihawal Road at Km 26/4 and 8.00 M Sinle Span Slab Culvert on Sidhi Kamrji Mauganj Raod at Km19/2 Under Sec. Patpara, Sub. Dn. Churhat Distt. Sidhi PWD Road SOR w.e.f 11-04-2
Special Repair work of 1.50 M Single Span Slab Culvert on Kandhwar ward No 01 to 08 App Road at Km 1/4, 2/4 and HP Culvert in Kandhwar App Road at Km 1/2,1/4 and Murtala Shankarpur Raod at km 1/2 Under Sec. Rampur Naikin, Sub. Dn. Churhat Distt. Sidh
Repair and Renovation work of Govt Non Residential Building (Central Store, Sectional Store, Upbhokta Court, Bal Kishore Court and Circuit House )Under Sec. HQ 1 Sub. Dn. Sidhi, Distt. Sidhi, PWD Building SOR w.e.f 01-01-24
White Washing, Colour Washing and Painting work in Govt Residential Building Under Sec. HQ 2 Sub. Dn. Sidhi, Distt. Sidhi, PWD Building SOR w.e.f 01-01-24
S R work of M.L.A. Bunglow No F - 48 at Sidhi, Sub. Dn. Sidhi, Distt. Sidhi, PWD Building SOR w.e.f 01-01-24 2nd call
Construction of Panchdaheriya to Khejdiya (Sant Singaji Road) Including Electric Pole Shifting work under Sub Division Shujalpur (II CALL)
Construction of Badalpur to Pochaner (Jabdiya Gharwas) Road Total length 7.50 Including Electric Pole Shifting work under Sub Division Shujalpur (II CALL)
WHITE WASH COLOUR WASH AND PAINTING WORK NON RESIDENTIAL BUILDING UNDER PWD SUB DIVISION AGAR DISTT AGAR MALWA
AR/SR/MOW/DEPOSITE WORK FOR RESIDENTIAL BUILDING UNDER PWD SUB DIVISION AGAR DISTT AGAR MALWA
AR/SR/MOW/DEPOSITE WORK FOR JUDICIAL QUARTERS UNDER PWD SUB DIVISION AGAR DISTT AGAR MALWA
STRENGTHENING WORK OF BORSALI-JHUNDAKHEDI TITODIKHEDA VIA MAKHAVAD ROAD LENGTH 5.50 KM UNDER SUB DIVISION SHUJALPUR
Construction of High Level Bridge Across Musadehi Nala on Kanhargaon Rohna Kalan Road Tehsil Chhindwara District Chhindwara MP
STRENGTHENING WORK OF CHAKROD TO DHABLAHUSSIANPUR TOTAL LENGTH 2.00 K.M. INCLUDING ELECTRIC POLE SHIFTING WORK UNDER SUB DIVISION SHUJALPUR
Construction of Single Lane Road from Methwada, Pirpipliya to Karwasa Road Length 06.00km. i/c Electric Pole Shifting Work. (Second Called)
Construction of CM Rise School Saikheda to Barchhi Approach Road Length 3.00 Km. Including Electrification Work Under Sub Division Gadarwara.(4th Call)
Construction of Kothiya to Noniya (Including Utility Shifting Work) Road Length 2.00 Km. Under Sub Division Gadarwara. (4th Call)