Loading…
Loading…
61 results • Recent activity
Strengthening at km 0/0 - 13/0 and 14/6 - 15/6 of Kanniseri - Mathiyasenai road (M-604).
Strengthening from km 4/0 - 5/6, 9/0 - 11/4, km 12/0 - 13/6, km 14/2 - 19/0 of Uthamapalayam-Surulipatti road (SH-102
Strengthening from km 1/0 - 5/2 and 5/6 -13/8 of Pullimancombai Road (M-667) including Reconstruction of Culverts at km 2/8(i),2/10,6/2, 6/6, km10/4andkm13/6, Construction of Protective wall at km 12/4 and Construction of Side Drain at km 12/10 and
Widening from two lane to two lane with paved shoulder and Strengthening at km 8/0 - 17/4 of Watrap - Maharajapuram - Alagapuri - Virudhunagar road including widening of pipe culvert at km 8/4, 9/8, 10/4, 10/8, 15/4, 16/8, 17/4 and construction ofbox
Strengthening at km 2/8 - 10/660 and construction of retaining wall at km 10/2 of Aruppukottai - Kurundhamadam road (ODR). (Job.No.TN-CRIF-2025-26-MDU-28)
Widening from Single Lane To Intermediate Lane and Strengthening at km 0/4 - 5/2 of Ahilandapuram Road including reconstruction of culverts at km 0/6, 1/6, 2/10 and 4/10 and Construction of retaining wall at km 3/6 (ODR-052