Loading…
Loading…
248 results • Latest
Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Participation restricted to Government seller Yes (This bid is reserved for participation only by Government sellers and hence Government sellers will be exempted from payment of Transaction charges)
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Healthcare, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Finance/Accounts, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Admin, Manpower Outsourcing Services - Minimum wage - Semi- skilled; High School; Finance/Accounts, Manpower Outsourcing Services - Minimum wage - Semi-skilled; High School; Healthcare, Manpower Outsourcing Services - Minimum wage - Semi-skilled; High School; Admin, Manpower Outsourcing Services - Minimum wage - Unskilled; Graduate; Finance/Accounts, Manpower Outsourcing Services - Minimum wage - Unskilled; Graduate; Admin
Goods Transport Services - Per MT - Transportation of PCM and Anthracene Oil from BSP Bhilai to SRU Bhilai; Oil/Gas Tanker Truck; NORMAL LOAD CAPACITY OF TANKER
PROCUREMENT OF VARIOUS SPARES FOR CCM TK BUCKET
TAPER ROLLER BEARING NO- 30230 MAKE- SKF/FAG FOR ALEX GRINDING MACHINE, ANGULAR CONTACT BEARING NO- 7220 HIGH PRECISION CTRDULP4 MAKE RHP FOR ALEX GRINDING MACHINE
SUPPLY OF STATIONERY ITEMS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; To conduct Structural Stability Test under Section 40 of the Factories Act, 1948 and obtain Stability Certificate (Form-2) along with recommendations..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Annual Contract for Servicing, Calibration and Maintenance of 8 (Eight) high-temperature furnaces for 3 years on Comprehensive basis for furnaces; Se..
SILICON METAL POWDER
Custom Bid for Services - SUPPLY AND RETROFIT OF ACBS INCLUDING COMPLETE ENCLOSURE OF TWO NUMBERS OF 1000 AMP AND TWO NUMBERS OF 800 AMP ACBS IS PLANT SUB STATION AT SRU IFICO Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Supply Installation erection and commissioning of Electric
M. S. ANGLE 50x50x6 mm, G. I. SHEET 0.5 mm, G. I. SHEET 03 mm, M. S CHEQUERED PLATE 5/6 MM
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Biannual Servicing and Calibration of compression testing machines of 300 Ton and 60 Ton capacity for 3 Years; Service Provider
SHELL AND TUBE TYPE HEAT EXCHANGER
MS Rod, Diameter 12 mm, Length: 5 meter, Diameter 25 mm
PROCUREMENT OF DIFFERENT HEX BOLTS WITH NUTS FOR
Custom Bid for Services - SAFETY AUDIT, FIRE AUDIT & TESTING & CERTIFICATION OF DIFFERENT TOOLS/TACKLES & PRESSURE VESSELS FOR ONE YEAR & STABILITY TEST AS PER RULE 3A, FORM 34 HAVING VALID FOR 5 YEARS Similar Category Energy Audit Service - Lumpsum Based
Ball Screw & Nut Assly. For Alex Grinding Machine (Model: R-60) Sl. No. - 08-09/01, Coolant Pump, 150 LPM, 0.37 KW, CP 31220 (AE) for Alex Griniding Machine (Model: R-60), Sl. No. - 08
PROCUREMENT OF VARIOUS M S PIPE AND RELATED ITEMS
POLYTHENE INSERTER
Procurement of Burner Spares for Basic Tunnel Kiln
Wavelength dispersive x-ray fluorescence spectrometer along with all accessories
Andalusite
Custom Bid for Services - CLEANING OF ALL WATER TANKS AND MAKING OF WATER CHANNELS AT SRU BHANDARIDAH Similar Category Operation And Maintenance Of Water Supply Systems
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Blast Furnace- Tap Hole clay, Round the clock monitoring of application of mudgun mass, supplied by SRU, Bhandaridah, in the tap holes of Blast Furna..
METALLIC MODIFIED BURNER MODULE FOR FURNACE
High Alumina Cement Grade A
Drive Pinion with shaft in fitted condition for Ball Mill (As per Drg No. MH/062/BM/79/B/R), Split Ring Gear for Ball Mill (in Two halves) (As per Drg. No. MH/084/BM/81/B)
R L GARG FURNITURE--R L GARG FURNITURE Low-back Chair With Fixed armrest with Padding
Custom Bid for Services - Annual Rate Contract for repairing and maintenance jobs for a pit less type fully electronic weighbridge of capacity 60MT 8 different types Weighing scales along with cleaning and painting of test weights of different deno.. Similar Category Facility Management Services - LumpSum Based
NATURAL FLAKY GRAPHITE 96%
Anti-collision device for EOT cranes, Installation Charges (for 04 Nos. )
Procurement of Wire Rope Slings of various sizes
Custom Bid for Services - Annual Contract for Servicing and Maintenance of Electric Curing Furnace 2 Nos of 50 Ton Capacity on a Non Comprehensive Basis including Breakdown Visits for Any Furnace for a Period of 2 Years Similar Category Operation And Maintenance Of Other Machines And Plants
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others
PROCUREMENT OF COPPER WINDING WIRE
Roller Tyre As per Drg. No. MM/184/75R For Pan Mill
Quick Lime For Chemical Industries (V2) Conforming to IS 1540 Part 1 (Q3), Stable Bleaching Powder for Treatment of Water Intended for Drinking (V3) conforming to IS 1065 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Changing of Screw Conveyors in M/H section; AS MENTIONED IN ATC, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Screw Conveyor casing for Screw Conveyors with fitting in line in M/H section; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Changing/Reversing of beaters of Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of side plate Impact Mill Rotor in A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication, dismantling, fitting of angular plates and bolt cover plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/dismantling and fitting of back plate; AS MENTIONED IN ATC, fitting of T plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of chute, dismantling and fitting of fabricated chute in Impact Mill A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Single deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Double deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/repairing of return pipeline in A/B/C line including dismantling and fitting; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Impact Mill body with repair of rotor; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Head Drum/Shaft of Bucket Elevator; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Dismantling, fabrication and fitting of TDS s Bowel/Mouth; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs on Ball Mill s screen by resetting screen and fallen/damaged shell liners in A/C Line; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs in Pulveriser No 1/No 2; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Welding and Grinding of used Split Ring Gear Two Halves Teech profile; AS MENTIONED IN ATC, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Unforeseen breakdown in M/H Maint Section; AS MENTIONED IN ATC, and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Impact Mill Bearing drive side or Non drive side; AS MENTIONED IN ATC
AMC of Integrated Security and Surveillance System - Monitor Operations, Employee Safety, Event Video Surveillance, Theft Prevention; Comprehensive; Hardware, Software, Wireless System, Networking System; Consumables to be provided by Service Provide..
Annual Maintenance service-AIR CONDITIONER
Digital Rockwell Hardness Testing Machine (Q3)
PROCUREMENT OF CELLING EXHAUST AND WALL MOUNTED
Supply of 2 Sets of Mother Block & Tap Hole sleeves for BSL SMS 1 5E Converter as per annexure I &
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Contract For Cleaning Of Pits of Mill House Shop 1A 1B and Shop 2 Material Material Charging in Tube Mill Micro Fine Bagging Shifting and Bunker Unlo..