Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | BRAJ KISHORE PRASAD | 3 | - |
| 2 | Schedule 2 | BRAJ KISHORE PRASAD | 3 | - |
| 3 | Schedule 3 | BRAJ KISHORE PRASAD | 3 | - |
| 4 | Schedule 4 | BRAJ KISHORE PRASAD | 3 | - |
| 5 | Schedule 5 | BRAJ KISHORE PRASAD | 3 | - |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
22 May 2026, 2:00 pmClosed
Changing of Screw Conveyors in M/H section; AS MENTIONED IN ATC
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Screw Conveyor casing for Screw Conveyors with fitting in line in M/H section; AS MENTIONED IN ATC
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Changing/Reversing of beaters of Impact Mill A/B/C Line; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of side plate Impact Mill Rotor in A/B/C Line; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication
dismantling
fitting of angular plates and bolt cover plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/dismantling and fitting of back plate; AS MENTIONED IN ATC
fitting of T plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of chute
dismantling and fitting of fabricated chute in Impact Mill A/B/C Line; AS MENTIONED IN ATC
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Single deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Double deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/repairing of return pipeline in A/B/C line including dismantling and fitting; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Impact Mill body with repair of rotor; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Head Drum/Shaft of Bucket Elevator; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Dismantling
fabrication and fitting of TDS s Bowel/Mouth; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs on Ball Mill s screen by resetting screen and fallen/damaged shell liners in A/C Line; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs in Pulveriser No 1/No 2; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Welding and Grinding of used Split Ring Gear Two Halves Teech profile; AS MENTIONED IN ATC
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Unforeseen breakdown in M/H Maint Section; AS MENTIONED IN ATC
and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Impact Mill Bearing drive side or Non drive side; AS MENTIONED IN ATC
9296219
GEM/2026/B/7510119
Two Packet Bid
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit
Ramgarh, Jharkhand
Item wise evaluation
SERVICE
3 documents required · 3 mandatory
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Changing of Screw Conveyors in M/H section; AS MENTIONED IN ATC | - | - | - |
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Screw Conveyor casing for Screw Conveyors with fitting in line in M/H section; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Changing/Reversing of beaters of Impact Mill A/B/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of side plate Impact Mill Rotor in A/B/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication | - | - | - |
| dismantling | - | - | - |
| fitting of angular plates and bolt cover plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/dismantling and fitting of back plate; AS MENTIONED IN ATC | - | - | - |
| fitting of T plates in Impact Mill A/B/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of chute | - | - | - |
| dismantling and fitting of fabricated chute in Impact Mill A/B/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Single deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Double deck screen changing in TDS of A/B/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication/repairing of return pipeline in A/B/C line including dismantling and fitting; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Fabrication of Impact Mill body with repair of rotor; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Head Drum/Shaft of Bucket Elevator; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Dismantling | - | - | - |
| fabrication and fitting of TDS s Bowel/Mouth; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs on Ball Mill s screen by resetting screen and fallen/damaged shell liners in A/C Line; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Repairing jobs in Pulveriser No 1/No 2; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Welding and Grinding of used Split Ring Gear Two Halves Teech profile; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Unforeseen breakdown in M/H Maint Section; AS MENTIONED IN ATC | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Manufacturing Unit; Changing of Impact Mill Bearing drive side or Non drive side; AS MENTIONED IN ATC | - | - | - |
DGM (MM & CC)-I/C, SRU SAIL, Steel Authority of India Limited, SAIL Refractory Unit, Ministry of Steel, (B.k. Toppo)
Exempted
Yes
22 May 2026
8 May 2026
22 May 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9296219.pdf
GEM_BID • 0.31 MB
1778216918.pdf
GEM_OTHER • 1.36 MB
1778216940.pdf
GEM_OTHER • 1.36 MB
ATC_d21bcf8b-9125-49be-b2a51778220416721_mjbhrp1.pdf
GEM_OTHER • 1.36 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .