Loading…
Loading…
8 results • Recent activity
Road Restoration for Replacement of various sizes of Pipe lines in FM VIII for Palladam Dharapuram Road JN to Kurukathi in NH81 KM 32 650 46 820 in CWSS to CLPRA in Coimbatore District under Revamping Works for 2025 2026
Road Restoration work in NH 181 road along Coimbatore Karur Tiruchirappalli Chidambaram Road in CBE Dist 450mm DI K7 and 200mm HDPE Pipe lines under Revamping works from IrugurPirivu to Ranganathapuram in FM VI under CWSS to CLPRA 2025 26
Shifting and Replacement of 800mm Dia PSC pipe with 800mm Dia MS CWTM Pipe in between LS 3500m to LS 4800m from Shakthi Theatre to Nadur Tank Medu due to road widening works carried by State Highways Department between the SH Chainage 28/6 to 37/8 al
Shifting and Replacement of 800mm dia PSC Pipe with 800mm Dia MS CWTM Pipe in between LS 5000m to LS 8800m from Nadur Tank Medu to TN 43 Hotel due to road widening works carried by State Highways Department between the SH Chainage 28/6 to 37/8 along
Shifting of Pipes due to Proposed Construction of Road Over Bridge at Thaneerpandal road in line of existing level crossing between Singanallur and Peelamedu Railway Station NABARD and Rural Roads Works under CWSS to CLPRA with Pillur Reservoir
Providing 150KLD of Water Supply Connection to Ananyas Nana Nani Homes Phase III Kulathupalayam to Dhaliyur Main Road Thondamuthur PO Dhaliyur Coimbatore 641109 under CWSS to Thondamuthur Pooluvapatty Thenkarai Vedapatty Dhaliyur Alanthurai and Perur