Loading…
Loading…
167 results • Recent activity
Replacement and FabricationMachiningManufacturing of Manual bypass to be done at 1.5 times the penstock pressure . 90 kgcm2 of MIV unit no. 03 of 3x40 MW SVP Bhaba Power House complete in all respect.
Hiring of hydraulic excavator 220 n Dumpers for removal of silt debris , muck boulders from down stream of the trench weir between RD 0/00 to 155.00 mtr and shifting of road towards newly constructed spillway channel culvert and Shingle flushing
HPSEBL/GPHD/DB-9/2025-26-151
Repair Overhauling and Servicing of ACB and Replacement of damaged VFD at 3X40MW Bhaba Power House
Replacement of damaged U-shaped Tubes, hydro, testing and associated hardware supply of 03 NOs of UGB oil cooler in 3x40MW SVP Bhaba H.E.P
Providing, installation, Refilling, testing and complete commissioning of various type of fire extinguishers, High pressure test (HPT) of extinghuishersalong with necessary spare at 3x40 MW Bhaba Power House..