Loading…
Loading…
60 results • Recent activity
Additional work for Strengthening of Subgrade in Subgrade Failure Stretches of NH-36 from Km 64.000 to Km 69.760, Km 90.760 to Km 119.000 and Km 126.000 to Km 160.000 under SOPD for the year 2019-20 under Bokulia NH Division, Diphu not covered by the
Construction of road parallel to Srikona ROB on NH-53 (Silchar Badarpur section) under SOPD for the year 2019-20 under PWD, NH Division, Silchar in the state of Assam
Improvement of Intermediate/Double Lane of NH 44 (Karimganj Town area) from 223/000 Km to 230/200 Km (Length 7.20 Km) with WMM, DBM and BC including hard shoulder and CC Drains under SOPD 2019-20
Improvement of NH-44 from 180.000 km to 191.000 km under SOPD for the year 2019-20 under Silchar NH Division, Assam
Improvement of Mission Chariali Bus Stand area (from Ch. 134.137 Km to Ch. 134.425 Km) on NH-15(old NH-52) under SOPD for the year 2019-20 under PWD, Rangia NH Division in the State of Assam
Providing renewal course over the existing surfaceof NH 37 from Ch. 603.160 km to 618.600 km (L 15.44 Km) and From Ch.633.600 Km to 636.800 Km ( L 3.20Km) including providing road side covered PCC drain at Lahowal Town alongwith road safety works