Loading…
Loading…
60 results • Recent activity
Repair and maintenance to NH-53 (Silchar Jiribam section) under SOPD for the year 2019-20 (Repairing of damaged pavement by providing WMM, BM and BC including earth work in shoulder, road side drain,interlocking paver block at side berm in stretches
Repair and maintenance to NH-54 (Silchar Lailapur section) under SOPD for the year 2019-20 (Repairing of damaged pavement by providing BM and BC at 1st km , 2nd km, 9th km to 11th km and 41st km including providing interlocking CC paver block at side
Providing Road Safety device and Road Furniture from km 173.325 to km 180.00 and km 191.00 to km 206.50, Repair and maintenance to stretches from km 175.90 to km 180.00 and providing CC Block hard shoulder at Katigorah from 198.874 to km 200.400 and
Repair of damaged Bituminous surface from km 134/414 to km 135/00 of NH-52(New NH-15) and development of parking area at Lakhimpur end of Mission Chari-ali Junction by providing ICBP over Granular Base and sub Base including Road Safety work
Improvement of road pavement by providng 40mm thick BC overlay includig filling of potholes with 50mm B.M, Road safety and Bridge Repairing works etc. from Km.316.00 to Km.357.00 of NH-37 (New NH-715) under SOPD, Assam for the year 2019-20
Improvement of NH 154 from Km 0/000 (existing) to Km 2/985 (existing) (Length 2.985 Km) with GSB, WMM, DBM and BC along with Surface Drain and ICBP in stretches under SOPD for the year 2019-20.(From Ch.0.00 km to Ch.2/985 km)