210 results • Recent activity
The provisions included in this estimate are 1.Oiling of shutters, 2.Greasing of shutters, 3.Engaging labour
The work includes clering grass for removal of vegetation and growths from the bed. The provisions included in the estimate are 1 . C l e a r i n g g r a s s , 2 . C l e a r i n g j u n g l e , 3.Earthwork excavation,CC 136
The items included in this estimate are earth work excavation for removing silt deposited by flowing water, Labour for removing blockage and for water distribution, lumpsum concrete for hole filling etc
The provisions included in the estimate are 1 . C l e a r i n g g r a s s , 2 . C l e a r i n g j u n g l e , 3.Earthwork excavation for desilting canal bed
This estimate includes 1.Demolishing concrete side wall 2.Providing CC 148 for bed of sidewall 3.Centring and shuttering for side wall. 4.CC 124for side wall 5.CC 136 for lining and9 9mm thick plastering.This estimate is prepared as per curren
The items of the estimate are Clearing grass, Earth work, CC 136 and plastering