This estimate includes items for clearing blockages during water distribution and canal watching for the year 2025-26
The work includes clearing grass for removal of vegetation and earth work for removing silt from the bed,CC136 for lining bed and 9mm thick plastering over the lining .
The proposal is to line right and left sides and bed for about 25.50 meters near ch. 6300m. Here,the bed of the canal is situated at a higher level compared to the adjacent land.r
It is proposed to construct a side wall at this chainage to strengthen the right bund. A side wall of length 55 m is included in this estimate.
As per the estimate, 136 concrete will be used for building side wall and bed lining 148 c o n c r e t e m i x w i l l b e u s e d f o r w a l l foundation.Also plastering of 9 mm thickness will be applied on side wall and above bed lining
The provisions included in the estimate is Clearing grass, clearing jungle and desilting canal bed, lining of bed, plastering over bed lining, CC side wall