Loading…
Loading…
203 results • Recent activity
The items of the estimate are clearing jungle, Earthwork, demolishing concrete, , CC 136 20mm,CC 124 20mm , centring and shuttering, Plastering, steel etc
The provisions included in the estimate are 1.Clearing grass, 2.Clearing Jungle, 3. Earthwork excavation for silt removaL
Near Ch 0.900 km, during water distribution, water from canal leaks through the right bund causing water to flow through the house located on the downside of right bund.
The provisions includes clearing grass, earthwork excavation for silt removal , cutting tree stumps etc.
The provisions included in the estimate are 1 C l e a r i n g g r a s s 2 C l e a r i n g j u n g l e 3 Earthwork excavation for desilting canal bed.