Loading…
Loading…
76 results • Recent activity
Power supply to Cancer Hospital at PRM MCH Baripada (Substation Part) for the year 2025-26.
SITC of Portable Aerosol Based Automatic Fire Extinguisher for DB and panel Board at SVPPGIP, G plus 6 New Building, Sishubhawan,Cuttack.
Shifting of 11Kv Line 10.6 Km with 100MM2 AAC and Shifting of 11KV Line -2 Km with HT Cable on Kamarda Baliapal Road for 2025-26.
Shifting of 33KV Line 1.2 Km, Shifting of 11KV Line 2.6Km, Shifting of LT Line 11.75 KM, 1010KVA S/s Shifting 5 Nos., 63KVA for widening and strengthening of Jamkunda Chhak of 22.700 Km on Basta Baliapal road to Pancupali via Kalipada, Balasore.
Shifting and relocation of existing electrical installation due to impvt. Such as widening and strengthening of Bandalo Enderpada road from 0.00 Km to 5.300 Km under Chatia Section, Jajpur
Supply and fixing of portable aerosol based Automatic Fire Detection and Suppression system in various LT and MV Electrical Panels at different health buildings under GE Section-III at SCBMCH, Cuttack