Loading…
Loading…
98 results • Recent activity
Bismi Nagar -Retaining wall extention near road between ch 0.037-0.046km and approach at Kallukuthi.
Construction of Canal Crossing near Pathanara
LAC ADS CADA Mangalam Project CS VDY Mangalam distributory Tail end Cheenakkappadam Field Channel 0 250 to 0 750 kmPhase IIGeneral Civil Work
Fern Cottage is an old building located on the left bank of the Malampuzha river , downstream of Malampuzha dam and was commonly rented out to tourists and guests for various occasions
The estimate prepared for carrying out maintenance work on the dam by repairing the damaged portions and properly beautifying the downstream side of the dam.It also provisions to ensure the clear and unobstructed flow of water into the river
DR packing topped by RR masonry, cc 136 mix over a bed and wearing coat with haunch on both sides, 9mm plastering, hydraulic excavator is to be used for creating temporary road and access