98 results • Recent activity
Demolishing stone rubble masonry,Earthwork in excavation,Cement concrete1.4.8,Centering and shuttering,Cement concrete1.3.6 Cement concrete 1.2.4,Plastering in cement mortar1.3 9 mm,DOWEL BARS,Filling with available excavated earth
Demolishing Stone Rubble Masonry for sidewall. Earth work in surface excavation RR Masonry.4.1.8 Cement concrete. Reinforcement for Encasing side wall etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
The work is proposed for the rectification of breached as well as damaged portion of Chittilancherry North branch canal between ch 0.015km and 0.133km of RBMC.
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1 15 3 Reinforcement Centering and shuttering earth filling Plastering etc