Loading…
Loading…
693 live235 closing this weekmost from South Coast Railway and Indian Railways
693 results • Latest
Annual Maintenance Contract for Kyosan make Electronic Interlocking system at 8 Stations (KEF, BMH, BEY, PNM, RGM, MLK, OBVP & MLGT) for a period of four years over Guntakal Division
Comprehensive Annual Maintenance Contact M/s. Siemens Make 180 KVA & 2x130 KVA Static Inverters through OEM for a period of Two (02) Years at Electric Loco Shed, Guntakal.
Grease Nipples for Hitachi Traction Motor as Per DRG: B/TRS/HM/GNL/4/005.
Modified stopper pin for WAP 7/ WAG 9HC locos for brake hangers nos. 3, 4, 7, 8, 9, 10, 15, 16, 17, 18, 21 & 22 as per Drg. No. C/ELS/LGD/Bogie/4/128 or latest if any.
Set of Hardware items for TM Assembly type: 6FRA 6068 as per CLW Spec 4TMS.096.075, Rev- 1,Alt-1, Set consists of 08 items as per attached annexure.(As per UVAM ID: 2100482).
Earth return cable assembly for WAG-9 locos as per CLW Spec. No. CLW/ES/3/0017 Alt - D or latest and GMO Drg. No. TRS/GMO/E-3/G-9/039, Alt - 2. (As per UVAM ID: 2100414).
Brake hanger lever assembly (LH) to CLW Drg.No.03.2.19.119 Alt.3, Ref.1 with Sleeve (Ref. 7) to be as per RDSO Drg. No.SK.EL 4549 Alt.2, Ref.1 and bush with material Manganese steel to IRS. R65-78 (As per UVAM ID: 2101027).
Provision of Anti monkey climbing device in monkey prone areas to stop climbing monkeys on OHE masts/structures in BZA division.
Set of Spares for mobile Contact Complete Assembly for high capacity, electromagnetic contactors consisting of 8 items (1).Fixing plate for mobile contact assembly To Drg. B/TRS/Cont,/4/30.Alt-A, Qty-1 no (2).Spring seat To Drg . B/TRS/Cont,/4/29.Alt,A Qty-1 no (3). Spring Guide To Drg B/TRS/Cont./4/28 Qty-1 no (4).Spring Retainer To Drg B/TRS/Cont,/4/27.Alt,A Qty-1 no (5).Special Hex.Head Screw To Drg B/TRS/Cont,/4/157, Ref,Drg.No B/TRS/cont/4/18,Alt. 2 ,Qty-3 no. (6). Contact Seat To Drg. B/TRS/Cont,/4/26.Alt,A Qty-1 no. (7).Round Shim (Thickness 0.5mm) To Drg OD:28mm,ID:10mm ,Thickness 0.5mm material phosphor bronze as per IS:7814-2005.Gr.III or Brass.Qty-1 no (8). Round Shim (Thickness 0.2mm To Drg OD:28mm,ID:10mm ,Thickness 0.2mm material phosphor bronze as per IS:7814-2005.Gr.III or Brass.Qty-5 no.(As per UVAM ID: 2100651).
Brake hanger lever assembly (RH) to CLW Drg.No.03.2.19.122 Alt.3, Ref.2 with Sleeve (Ref. 7) to be as per RDSO Drg. No.SK.EL 4549 Alt.2, Ref.2 and bush with material Manganese steel to IRS. R65-78. (As per UVAM ID:2101027).
Set of Connecting strap for WAP-4 Locomotive consisting of 5 items / 24 Nos 1) Connection strap outer to CLW Drg No 03/3/19/53 Alt.6 -08 Nos/Set. 2) Connection strap outer to CLW Drg No 03/3/19/56 Alt.6 -04 Nos/Set. 3) Connection strap inner to CLW Drg. No. 03/3/19/91 Alt-6, - 04 Nos/Set. 4) Connection strap inner to CLW Drg. No. 03/03/19/92 Alt-7-04 Nos/Set. 5) Connection strap inner to CLW Drg. No. 03/03/19/93 Alt-6-04 Nos/Set. (As per UVAM ID: 2101027).
Supply, installation and commissioning of 20 feet(L)x 10 feet(w)x 8.5 feet(H)size MS Prefabricated office porta cabin.
Wire wound resistor 9.4 Ohms +/-5% 750 Watts along with fixing Clamps size: 105mm at both ends. Note: One sample should be got approved before effecting bulk supply.
Set of Gaskets for servomotor assembly as per CLW Drawing No.3.TWD.102.034, Alt.3 o r latest. Each set of gaskets shall supplied in single packet
BZA Division: BZA-VSKP Section: Improvements and Raising of passenger platform at Powerpeta, Gannavaram, Pulla stations in SSE/Works/EE section in ADEN/EE Sub Division under the Jurisdiction of DEN/CENTRAL/BZA.
Set of coupling cap double ferrule 10mm S S fittings as per CLW Specification
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 kms per month Hiring of one number of Non AC Road vehicle Tata Sumo, Mahindra Bolero or equivalent for a period of 3 years(Thirty Six) months for departmental use of DSTE- I/VSKP of VSKP Division; O..
Zonal contract of "P.Way Zonal works under SSE/P/VBL on RV line for period ending 30-09-2027 under the jurisdiction of Assistant Divisional Engineer/PVP.
Zonal contract of "P.Way Zonal works under SSE/P/GPI on RV line for period ending 30-09-2027 under the jurisdiction of Assistant Divisional Engineer/PVP
Zonal contract of "P.Way Zonal works under SSE/P/VSKP on Main line for period ending 30-09-2027 under the jurisdiction of Assistant Divisional Engineer/Track/VSKP.
Comprehensive Annual Maintenance Contract of 500 Ton Hydraulic Wheel Press (Make: BBM) at Carriage Repair Shop, Tirupati for a period of Five years
Vijayawada Division- 1) Construction of a new parcel office at RJY in SSE/W/RJY section under ADEN/ RJY sub -division.2) APT:-Provision of COP shelters of IRS type on Platform 2&3 in ADEN/ SLO sub-Division under Sr.DEN/North/BZA jurisdiction.3) RJY;- Construction of New quarters for staff 14 Nos ( Type II-8 Nos,Type-III-02 Nos and Type IV-04 Nos) at Rajahmundry station in SSE/ Works/RJY section under ADEN/ RJY sub division in DEN/ North /BZA jurisdiction.4)RJ RJY: Construction of a 50-bedded Male Barrack at Rajahmundry.- Electrical arrangements
Zonal contract of "P.Way Zonal works under SSE/P/VSPS on Main line for period ending 30-09-2027 under the jurisdiction of Assistant Divisional Engineer/Track/VSKP
Zonal contract of "P.Way Zonal works under SSE/P/MYD on Main line for period ending 30-09-2027 under the jurisdiction of Assistant Divisional Engineer/Track/VSKP
Flash Butt Welding of 60Kg rails to form LWR or longer welded rails using contractors own self propelled Rail-cum-Road mobile flash butt welding plant on NG line of Visakhapatnam division under the jurisdiction of ADEN/PSA .
1. Provision of Dual MSDAC in place of DC track circuits at VSKP-GPT Auto-section of Visakhapatnam division. 2. Provision of Dual MSDAC for redundancy between GPT-DVD Auto-section of Visakhapatnam division. 3. Provision of Dual MSDAC for redundancy at OEC Yard & RYD Yard in Marshalling yard of Visakhapatnam division.
BZADivision-1)Provision of Sewage Treatment plant in compliance to NGT guide lines, APPCB and CPCB at TDD( 100 KLD) & NDD (100 KLD) stations.2)BZA Division:- Provision of sewage Treatment plant in Compliance to NGT guidelines ,APPCB and CPCB at SLO (100 KLD), ANV (35KLD) & CCT (35KLD) stations.3)BZA Division:- Provision of Sewage Treatment plant in compliance to NGT guidelines, APPCB and CPCB at AKP (100 KLD) & TUNI (35 KLD) stations - Electrical & pumping Arrangements
Set of 'O' Ring and gasket suitable for M/s Flow well/Flow Tech make
Comprehensive Repair/ Reconditioning of 3 Phase Traction Motor (6FRA6068) during IOH Schedule at Electric Loco Shed, Vijayawada.
Set of Hardware items as per SK No. 6030, Alt. 4 or latest for MSU tubes in conventional locomotives.
Locking plate along with hex head screw M6 x 12LG for breather assembly.
Set of 04 items required to Elbow connector as per CLW Drg. No. 1209-18.406-035, Sl. No. 1, Alt. 2 or latest if any.